| WJ. Towell Engineering Group-Towell Infrastructure & Projects Co.LLC. | Project Manager OMAN | 3/2019 - 10/ 2020 | - Duqm Refinery EPC Package No 1. Value: 52M$.
- Pipe rack foundations, Utilities, pavements, RCC Cooling Tower, Culverts, deep tanks, drainage channel etc. Peak manpower-686No.
- Client-Tecnicas Reunidas & Daewoo (TRD) – (JV)
- Achieved : Reached 7 milestones within schedule & No LTA.
| Refinery |
| Hasan Juma Backer Trading and Contract-ing Company LLC. Oman (HJB) | Project Manager OMAN | 01/2018 – 02/ 2019 | - Roads & Utilities Infrastructure for business park 1at OCEC, Omran. Value: 2.20M OMR
- Roads, Utility Services, MSER walls, Slope protection & stabilization, Irrigation & Landscaping, Road lighting.
- Client/ Consultant: OMRAN/KEO International.
| Infra |
11/2015 – 01/2018 | - Extension of Sohar Industrial Estate–Phase7. Value: 54M $.
- Asphalt Roads, Sewer, Water, Irrigation, Storm drain channel, Dry utility services, Earthen dyke with stone pitch, STP-2000 Cu.m /day, Culverts. Client/Consultant: (PEIE)/NEC.
- Peak manpower-510, Machinery-165No.
- Accomplished: Utilized in-house resources only Change order Claimed-17no, project value increased 6% with 6 months EOT.
- Enhanced cash flow that claimed activity-wise instead of item wise specified in contract by submit Boq item rate breakup
| Infra |
| Navayuga Engineering Co WLL. (NEC) | Construction Manager QATAR | 12/2013 – 10/2015 | - Breakwater Wakra dock, New Service No4 and Marpol reception berth. Rock revetment shore protection. Value: 98M QAR
- Client: Qatar Petroleum.
- Accomplished: Led both Engineering and Construction.
- Visited Malaysia for fender FAT with QP (Client) & Company.
- Achieved : Handed over 3 milestones a month ahead of schedule
| EPC Marine |
| Coastal Marine Construction & Engineering Co | Project Manager INDIA | 01/2013 11/ 2013 | - Seawater Intake & Outfall System for 1600 MW Thermal power station at Parangipettai. Kadlore. Value: 700M INR.
- RCC De-silting basin, Intake channel, Intake and outfall pipelines
| Infra/ Marine |
Overseas AST co LLC. Dubai (AST.CO) | Project EngineerUAE | 10/2011 – 12/2012 | - Construction of Berth No 8, top side facilities & pipelines. Jebel Ali. DUBAI. Value: 90M AED
- Client/Consultant: GRC, Dubai/Mott MacDonald.
| Marine |
11/2010 10/2011 | - Bridge connecting Abudhabi & Hodriyat Island. Al Bateen.
- Client/ Consultant: TDIC/ Parsons International. (AST&VSL (JV)
| Marine |
10/2009 – 11/2010 | - Bulk Jet Fuel Oil Bulk Storage tanks and Infrastructure facilities for UAE Armed Forces Abudhabi. (Fast-Track project).
- Client/PMC: Abudhabi Military headquarters supply and transport corporations at the Western sector/ADNOC.
- Achieved: Independently handled all works except tank construction and Commission started 2 months ahead of schedule ((work round the clock) - (In-charge – 1Package -Al Dhafra Air Base) , Awarded best performance employee
| Oil & Gas/ Infra |
09/2008 - 10/ 2009 | - Chilled Water distribution network for district cooling scheme to 5 metro stations. Dubai
- CS pre-insulated pipelines, NDRC Micro tunneling, Thrust boring, sheet pile cofferdams, trench shoring, Chambers, Reinstatement.
- Client/ Consultant: Tabreed/Parsons International.
| Infra/Civil& Mech |
| BGR Energy System Ltd .India (BGR) | Section Manager INDIA | 08/2005 – 09/2008 | - Four-lane Highway (Road) NH45A (47KM) & shifting Existing Water Supply Pipelines. Value 2 billion INR
- Road 20KM, Pipe shifting 12 lines length from 30km to 40km each.
- Client/ Consultant: NHAI/Becom-Nice.
| Infra |
| Hindustan Construction Company. | Senior Eng Gr.I INDIA | 12/2003 – 08/2005 | - Water supply and Sewerage system Tirupur- Tamil Nadu.
- Cross country water transmission CS spiral weld pipeline–120KM.
- Client: new Tirpur area Development Corporation.
| Infra/ Civil &Mech |
| IVRCL Infrastructures and Projects Ltd | Senior Engineer INDIA | 12/2000 – 12/2003 | - Combined Water Supply Scheme. (Vedaranyam. TamilNadu.
- Client/TWAD Board (Government sector).
- Achieved: Independent in-charge and completed 1 /5package
| Infra |
| RPP Infra Projects LTD. India. (RPP) | Site civil Engineer /INDIA | 06/1995 – 12/2000. | - Sewerage Improvement Scheme for Madurai Corporation India.
- River Vaigai Rehabilitation Scheme (Irrigation project)
- Apartments – Buildings Project.
| Infra |
| Responsibilities carried out as Project Manager |
- Headed baseline schedule preparation, risk register, PQP, and Budget.
- Influence with management for right resources, qty, on-time & finalize subcontract works.
- Develop teams, set assignments, Monitor productivity
- Early noticed the risk exists in site with design documents.
- Clear 3rd party obstructions with the assistance of consultant & Client.
- Developed credentials for Variation claim, EOT & contractual letters on time.
- Strictly adhere to scope & QHSE procedures, policies, through controlled RFI rejections, NCRS,
- Groundwork, in advance for continuous work front availability in Oil & refinery project.
- Evaluated variation proposal.
| - Introduced new report control system for diesel, labor overtime hours and subcontractor equipment hours update on daily basis.
- Created reconciliation report system and internal audit system for inventory control.
- Maintained the procurement delivery schedule not to hit the cash flow.
- Chaired internal meetings & assigned responsibilities.
- Correlate actual progress expenses with billing value for corrective action over the weak area.
- Accelerated preparation & approvals of the method statement, Shop drawings, Material submittal, change order, monthly IPC to IPA.
- Steered insurance claim 2times with high profit upon heavy rainfall flooding at site in Oman.
|
| Responsibilities carried out as Construction Manager /Project Engineer. |
- Indulged in schedule, & budget preparation.
- Noticed errors in design drawings with contract documents.
- Workout forecast, look ahead, Monthly program.
- Exercise method statements shop drawings, material submittal.
- Develop teams, set assignments, productivity monitoring
- 3rd party specialized vendor coordination (geotechnical investigation and surveying, Testing laboratory, Formwork, Dewatering, Material supply)
- Clear 3rd party obstruction.
- Educate team to follow PTW, reporting structure, and safety training program.
- Update daily progress with issue to Engineer for EOT.
- Issues highlighted in war room meetings, daily program, weekly progress, weekly concrete coordination meeting in Oil and refinery field.
- Technical lead for enhance quality and productivity and controlled RFI rejections, NCRS.
| - Providing existing field datas to engineering consultants, outside vendors to match with the field.
- Maintain quick approval & smooth function, insight into design consultant documents with FEED before submission.
- Organized workshops with multidiscipline QP engineers upon request along with design consultant (COWI &TEBODIN) for submittal approval at once.
- Organize day-to-day work arrangements on the field in advance.
- Progressive on productivity, construction methodologies, work sequence, enhancing and team motivation
- Work round the clock to meet deadlines.
- Coordinate subcontractors for effective productivITY.
- Follow-up acquiring and Optimizing resources
- Applied NOCs, problems resolving, controlled equipment & manpower overtimes.
- Data’s feed to QS for new variation proposal.
- Promptly closing NCR.
|
| | | | | | |