beBee background
Professionals
>
Utilities / Energy
>
Abu Dhabi
Essaid Elhabibi

Essaid Elhabibi

Completion and commissioning manager offshore

Services provided: CMS Designers

Abu Dhabi, أبوظبي
د.إ250 / hour
Approximate rate

Social


About Essaid Elhabibi:

Completion and Commissioning Manager offshore EPC Oil and Gas +wind turbine offshore 

Experience

CAREER HISTORY:
Control Contracting & Trading Company (CCTC) (from 9 May 2022)
Current Designation Completion &Commissioning Manager
Project 1: 11Kv Load migration from PGP to PDP UCC ADNOC offshore 60 MUSD
Project 2: Replacement of EDGS and LV system upgrade LOWER ZAKUM FIELD ADNOC offshore 50MUSD
Project 3: Scope of FOUR (4 nos.) site Schemes in IN UPPER ZAKUM FIELD ADNOC offshore 47 MUSD
Responsibility
- Pre-com &Commissioning Execution Plan Development
- Pre-commissioning and commissioning procedures
- Integrated Project Schedule Development
- Systemization of Plot Plans, PFDs, P&IDs & Specialty Equipment, Single Line Diagram, Cable Runs,
Safety Instrumented Systems, and instrumentation
- Completion strategy
- HSE plan and LOTO procedure
- Systems & Subsystem breakdown
- Vendor Coordination and vendor management and Surveillance and inspections for project equipment
- Staffing plan/ Mobilization plan/OEM mobilization plan.
- Follow up on Site Pre-commissioning and Commissioning activities for all disciplines.
- Commissioning planning Level 4 and Level 5
- Lead and attend weekly meetings/monthly meetings (progress, status, ..)
- Attend FAT/SAT
- Lead PSSR (Pre-Start-up Safety Review)
SSE Renewables (from August, 2021 to April, 2022)
Current Designation (E&I Commissioning Engineer)
Project 1: Seagreen offshore wind farm Topside.
Responsibility
Offshore Substation Platform (OSP) Topside Precommissioning,commissioning , Completions, and Handover ,
- GIS 66KV Circuits 1,2 and 3 (ABB)
- GIS 220KV Circuits 1,2 and 3 (ABB)
- Transformers 220KV/66KV 390MVA (koncar) and auxiliary Transformers 66KV/0.415KV
- Relay panels for GIS 66KV Circuits 1,2 and 3 ( ABB Relay REL650,REF 620,REB650,REB670)
- Relay panels for GIS 220KV ( ABB Relay RED670,REC670,REF 620,RET615,RET670 and GE P40)
- LV 415KV switchgear (ABB), SCADA (ABB), AC/DC UPS (Schneider), Fire & gas , inert gas, CAF and
HVAC.
- Telecommunication.
Alasab General Transportation and Contracting LLC (November, 2020 to July, 2021)
Designation (E&I Construction and Commissioning Manager)
Project 1: ADNOC onshore/offshore EPC for Rumaitha Thamama Zone B Phase III Expansion Development
,Project Value: 175M$
Responsibility
Managing of Construction and Commissioning for new clusters and existing clusters.
- OHL 33KV, ETR and ITR, Wellhead control panels and Chemical injection
- Oil production, Gas lift, Water injection, Gas injection
- Hot loop check, Tubing flushing, Pressure test, Hydro-test and Leak test
Petrofac International Ltd (October, 2018 to November, 2020)
Designation (E&I Principal Commissioning Engineer)
Project 1: TURKSTREAM, EPC, Client South stream, Turkey, Project Value: 400M$
Project 2: ADNOC onshore Qusahawira Field Development Phase II, EPC Abu Dhabi UAE, Project Value: 580M$
Responsibility
EI&T Lead Commissioning Engineer for GIS, MCC’S, LV Switchgear’s, 3 GEG (1 MW), OHL 33Kv, CDS,
WELLPADs, GLOPWH, WAGWH and GS2
- Commissioning Execution Plan Development (also Discipline Plans)
- Integrated Project Schedule Development
- Systemization of Plot Plans, PFDs, P&IDs & Specialty Equipment, Single Line Diagram, Cable Runs,
Safety Instrumented Systems and instrumentation
- Development of Turnover Folders, Systems Walk-down Packages, Pre-Commissioning, Commissioning
Procedures and Loop Folders
- Implementation of LOTO P&IDs
- Systemization of Systems & Sub system and MC Walk-downs
- Vendor Coordination and vendor management and Surveillance and inspections for project equipment
JACOBS ENGINEERING (June, 2016 to September, 2018)
Designation (Deputy Commissioning Manager)
Project 1: Merah Khouribgha and Laayoune Mining EPCM, client OCP Morocco.
Responsibility
- Ensure the safety, quality, value, timeliness of the project.
- Develop, manage, and execute all commissioning and related activities in conformance with Jacobs
engineering SA policies and procedures, contracts, plans, specifications, schedules and cost estimates.
- Manage and supervise the commissioning of various systems including MV Electrical System, Generator
engines, Mechanical and piping Systems, Integrated Automation Systems, Safety and Fire Systems.
- Work closely with various stakeholders including OCP as client, The Project Manager, Engineering
Manager, Quality Manager and Construction team to provide subject-matter expert advice leadership.
Projects 2: Owner Project Investment (ODI) is one of the largest fertilizer EPCM projects in the world,
ODI1, ODI2, ODI3 and ODI4, Project Value: 2.5 billion usd
Responsibility
- Improve the ODI Electrical systems break down, mark-up, operation test procedure…. Provide guidance to
the Electrical discipline in accordance with contract agreement
- Commissioning and startup Switchyard 60/10Kv 72MVA, Steam Turbine Generator 60MW, VFD, SST,
UPS, DC&AC batteries, MCC, MV Cells, ABB Relays and MV/LV Transforms 11Kv/0.42k, Start–up of
units OSBL, SAP, PAP and DAP.
VINCI GROUP CEGELEC (September, 2011 to April, 2016)
Designation (Electrical Commissioning lead)
Projects : ODI 1, ODI 2, ODI 3 and ODI 4 Switchyard 60KV/10KV (Client JACOBS/OCP):
Responsibility
- Follow up of quality inspections, Implementation of quality program.
- Pre-commissioning of HV equipment’s (CT&VT, HT CB, Disconnectors & transforms 60/10 KV), MV
panel ABB (Relays REF630, REF620, REF615, REB615, RED 615, REM620) and (LV PANEL, DC and
AC UPS AEG)
- SCADA System of Switchyard 60KV/10KV (Relays F650, T60, MICOM P543, CC1000 and EPM600)
- Commissioning and configuration of equipment (VFD et starters MV (Siemens), VFD LV (Siemens), MCC
(Siemens & Allen Bradley) Control and command of HV substations, MV PANEL ABB).
- Commissioning with configuration of equipment’s, VFD (Schneider Electric), Protection Relays (Tesys)
and MCC (Okken)
- Configuration and tests of energy metering system Iton SL7000 and power quality monitoring Alpes
technology of Switchyard 225Kv of KHOURIBGA
Project : Renewable energy Wind Turbines farms onshore
- WIND FARM HOUMA (50.6MW), 22 Siemens turbines with a unit capacity of 2.3 MW
- WIND FARM FOUM EL OUED (50.6MW), 22 Siemens turbines with a unit capacity of 2.3 MW
- WIND FARM AKHFENIR (101.87MW) 61 Alstom turbines with a unit power of 1.7 MW
Responsibility
Engineering
- Preparation of design review , project specifications and philosophy for electrical equipment
- I was also involve on Materiel procurement (preparations of material requisition ,vendor offer review ,
technical review and preparation purchase order )
- Gate review and constructability review
- Supporting Engineering team to develop GA drawing , Wiring circuit diagram , layout drawing for the
Switchyard 22KV/60KV
- Reviewed and approved Cable size study for 22KV cable (WT) for Circuit 1,2,3 and 4
- Coordination with vendors engineering department document review and approval (Schneider, Nexans, and
Siemens, AEG (UPS and batteries)).
- Review Fire and gas drawing developed by vendor (GA drawing , loop diagram , layout drawing, termination
drawing for JB and f&G Panel )
- Supporting our engineering team for Lighting/Earthing /lightening for the switchgear 22kv/60KV Drawing
- Reviewed and approved Cable routing and cable trouches was developed by our subcontractor
DELIVERABLES (OFFICE- ENGINEERING & PROCUREMENT STAGE)
- System and Subsystem Breakdown (E&I-HVAC-Telecom)
- Preparation of “Project Preservation Procedure”
- Preparation of Method Statement
- Preparation of “Operational Test Procedures” (OTP’s for energization)
- Vendor Document Review (Factory Acceptance Test “FAT”/ Site Acceptance Test “SAT”, Asset Integrity
Management System “AIMS”) “Commissioning Spares Parts, Special Tools & 2 years Warranty Spares list”
Review & Approval
- Attend Factory Acceptance Tests – issue FAT report- Track down Outstanding Punch (if any)
- Population of Pre-com & Com activities within Completion Management Database
- Establish Ready For Commissioning (RFC)/ Ready For Start Up (RFSU)/ Ready For Hand Over (RFHO)/
Provision Acceptance Certificate (PAC)/ Final Acceptance Certificate (FAC) Hand over procedure
- Establish (by priorities) Commissioning & Start up Sequences & Vendor Mobilization Schedule
- Preparation HSE Commissioning Plan (LOTO)
DELIVERABLES (SITE- CONSTRUCTION – PRE- COM & COMMISSIONING STAGE)
- Follow up the Project Equipment Multidiscipline Preservation activities
- Follow up cable pulling, termination, glanding , electrical equipment erection .
- Ensure PTW ,coordinate work with other discipline
- Supervise Cables Continuity & Insulation & Hi-Pot & Bus bar torqueing, Relay Protection Setting
Calibration, Loop testing …activities
- Attend Mechanical Completion Walk-downs by Sub system
- Follow up the Site Acceptance Testing & Mechanical Completion punch items close out & MC/RFC/ RFSU
Cert. Status
- Issue Vendor Call out Instructions
- Execute Operational Test Procedures (OTP`s)
- Attend “Pre-com & Com & Hand over” Daily Progress Meeting
- Lead Pre-Start up Safety Review “PSSR”
- Assist & Supervise Performance Test
Project 11: « Renault Tangier RTM2 » (Client RENAULT)
Responsibility
- Tests and commissioning of MV/LV PANEL (Schneider Electric)
- Designed Layout drawing of cable tray, lighting and bus duct
SNEF GROUP MAPICER Morocco (August 2010 to August 2011)
Designation (Electrical Designer/ Commissioning)
Project: Renault automobile Manufactory Tanger
- Electrical Designer of MV/LV PANEL.
- Commissioning of switchyards MV/LV 22Kv/400Vac
VIELEC SA Casablanca Morocco (July 2009 to July /2010)
Designation (Electrical Designer)
Project 1 and 2: Dam TASKOURT and OUED ELMALEH AIC métallurgie

Education

EDUCATION
MBA-Business of Management
Girne American University UAE 2021/2022
Master’s Degree: Electrical Engineering.
Faculty of Sciences and Technologies, Hassan 1st
University, Settat, Morocco 2017/2018
Bachler’s Degree: Electrical Engineering
Faculty of Sciences and Technologies, Cadi Ayyad
University, Marrakesh, Morocco 2005/2009

Professionals offering similar services to those of Essaid Elhabibi

Professionals in the same Utilities / Energy sector as Essaid Elhabibi

Professionales offering CMS Designers services

Professionals from different sectors near Abu Dhabi, أبوظبي

Jobs near Abu Dhabi, أبوظبي

  • Novotel

    كبير الطهاة دي بارتي

    Found in: DrJobAR AE A2 - 6 days ago


    Novotel أبوظبي, United Arab Emirates

    ينظم مع الفريق التحول في القسم فيما يتعلق بإنتاج ميز أون بليس وخدمته · توجيه الفريق خلال العمليات اليومية · يحافظ على علاقات جيدة مع الزملاء ويحفز الزملاء · يضمن أن التدريب على أساس فردي قد تم تنفيذه وفهمه · تحقق من جميع الإعدادات الخاصة بوظائف المأدبة. مسؤول عن التوقيت الصحيح أث ...

  • ENMA Recruitment LLC

    Automation Engineer

    Found in: Talent AE 2A C2 - 1 day ago


    ENMA Recruitment LLC Abu Dhabi, United Arab Emirates

    The job posting is outdated and position may be filled · An automation engineer's job involvesdesigning, programming, simulating and testing automated processes. They work with automated machinery from concept to prototype to help deliver computerised solutions for software proce ...


  • New York University Abu Dhabi أبو ظبي, United Arab Emirates

    تبحث مجموعة التراث الجيني في جامعة نيويوركأبوظبي عن مساعد ما بعد الدكتوراه متحمس للغاية (خريج دكتوراه حديث،أكمل الدكتوراه في العامين الماضيين) في علم الأحياء أو علم الأحياءالدقيقة أو مجال ذي صلة يتمتع بخبرة قوية في تحليل بيانات الجينوموالميتاجينوميات. . · سيعمل المرشح الناجح على ...