Essaid Elhabibi
Utilities / Energy
Services offered
Completion and Commissioning Manager offshore EPC Oil and Gas +wind turbine offshore
Experience
CAREER HISTORY:
Control Contracting & Trading Company (CCTC) (from 9 May 2022)
Current Designation Completion &Commissioning Manager
Project 1: 11Kv Load migration from PGP to PDP UCC ADNOC offshore 60 MUSD
Project 2: Replacement of EDGS and LV system upgrade LOWER ZAKUM FIELD ADNOC offshore 50MUSD
Project 3: Scope of FOUR (4 nos.) site Schemes in IN UPPER ZAKUM FIELD ADNOC offshore 47 MUSD
Responsibility
- Pre-com &Commissioning Execution Plan Development
- Pre-commissioning and commissioning procedures
- Integrated Project Schedule Development
- Systemization of Plot Plans, PFDs, P&IDs & Specialty Equipment, Single Line Diagram, Cable Runs,
Safety Instrumented Systems, and instrumentation
- Completion strategy
- HSE plan and LOTO procedure
- Systems & Subsystem breakdown
- Vendor Coordination and vendor management and Surveillance and inspections for project equipment
- Staffing plan/ Mobilization plan/OEM mobilization plan.
- Follow up on Site Pre-commissioning and Commissioning activities for all disciplines.
- Commissioning planning Level 4 and Level 5
- Lead and attend weekly meetings/monthly meetings (progress, status, ..)
- Attend FAT/SAT
- Lead PSSR (Pre-Start-up Safety Review)
SSE Renewables (from August, 2021 to April, 2022)
Current Designation (E&I Commissioning Engineer)
Project 1: Seagreen offshore wind farm Topside.
Responsibility
Offshore Substation Platform (OSP) Topside Precommissioning,commissioning , Completions, and Handover ,
- GIS 66KV Circuits 1,2 and 3 (ABB)
- GIS 220KV Circuits 1,2 and 3 (ABB)
- Transformers 220KV/66KV 390MVA (koncar) and auxiliary Transformers 66KV/0.415KV
- Relay panels for GIS 66KV Circuits 1,2 and 3 ( ABB Relay REL650,REF 620,REB650,REB670)
- Relay panels for GIS 220KV ( ABB Relay RED670,REC670,REF 620,RET615,RET670 and GE P40)
- LV 415KV switchgear (ABB), SCADA (ABB), AC/DC UPS (Schneider), Fire & gas , inert gas, CAF and
HVAC.
- Telecommunication.
Alasab General Transportation and Contracting LLC (November, 2020 to July, 2021)
Designation (E&I Construction and Commissioning Manager)
Project 1: ADNOC onshore/offshore EPC for Rumaitha Thamama Zone B Phase III Expansion Development
,Project Value: 175M$
Responsibility
Managing of Construction and Commissioning for new clusters and existing clusters.
- OHL 33KV, ETR and ITR, Wellhead control panels and Chemical injection
- Oil production, Gas lift, Water injection, Gas injection
- Hot loop check, Tubing flushing, Pressure test, Hydro-test and Leak test
Petrofac International Ltd (October, 2018 to November, 2020)
Designation (E&I Principal Commissioning Engineer)
Project 1: TURKSTREAM, EPC, Client South stream, Turkey, Project Value: 400M$
Project 2: ADNOC onshore Qusahawira Field Development Phase II, EPC Abu Dhabi UAE, Project Value: 580M$
Responsibility
EI&T Lead Commissioning Engineer for GIS, MCC’S, LV Switchgear’s, 3 GEG (1 MW), OHL 33Kv, CDS,
WELLPADs, GLOPWH, WAGWH and GS2
- Commissioning Execution Plan Development (also Discipline Plans)
- Integrated Project Schedule Development
- Systemization of Plot Plans, PFDs, P&IDs & Specialty Equipment, Single Line Diagram, Cable Runs,
Safety Instrumented Systems and instrumentation
- Development of Turnover Folders, Systems Walk-down Packages, Pre-Commissioning, Commissioning
Procedures and Loop Folders
- Implementation of LOTO P&IDs
- Systemization of Systems & Sub system and MC Walk-downs
- Vendor Coordination and vendor management and Surveillance and inspections for project equipment
JACOBS ENGINEERING (June, 2016 to September, 2018)
Designation (Deputy Commissioning Manager)
Project 1: Merah Khouribgha and Laayoune Mining EPCM, client OCP Morocco.
Responsibility
- Ensure the safety, quality, value, timeliness of the project.
- Develop, manage, and execute all commissioning and related activities in conformance with Jacobs
engineering SA policies and procedures, contracts, plans, specifications, schedules and cost estimates.
- Manage and supervise the commissioning of various systems including MV Electrical System, Generator
engines, Mechanical and piping Systems, Integrated Automation Systems, Safety and Fire Systems.
- Work closely with various stakeholders including OCP as client, The Project Manager, Engineering
Manager, Quality Manager and Construction team to provide subject-matter expert advice leadership.
Projects 2: Owner Project Investment (ODI) is one of the largest fertilizer EPCM projects in the world,
ODI1, ODI2, ODI3 and ODI4, Project Value: 2.5 billion usd
Responsibility
- Improve the ODI Electrical systems break down, mark-up, operation test procedure…. Provide guidance to
the Electrical discipline in accordance with contract agreement
- Commissioning and startup Switchyard 60/10Kv 72MVA, Steam Turbine Generator 60MW, VFD, SST,
UPS, DC&AC batteries, MCC, MV Cells, ABB Relays and MV/LV Transforms 11Kv/0.42k, Start–up of
units OSBL, SAP, PAP and DAP.
VINCI GROUP CEGELEC (September, 2011 to April, 2016)
Designation (Electrical Commissioning lead)
Projects : ODI 1, ODI 2, ODI 3 and ODI 4 Switchyard 60KV/10KV (Client JACOBS/OCP):
Responsibility
- Follow up of quality inspections, Implementation of quality program.
- Pre-commissioning of HV equipment’s (CT&VT, HT CB, Disconnectors & transforms 60/10 KV), MV
panel ABB (Relays REF630, REF620, REF615, REB615, RED 615, REM620) and (LV PANEL, DC and
AC UPS AEG)
- SCADA System of Switchyard 60KV/10KV (Relays F650, T60, MICOM P543, CC1000 and EPM600)
- Commissioning and configuration of equipment (VFD et starters MV (Siemens), VFD LV (Siemens), MCC
(Siemens & Allen Bradley) Control and command of HV substations, MV PANEL ABB).
- Commissioning with configuration of equipment’s, VFD (Schneider Electric), Protection Relays (Tesys)
and MCC (Okken)
- Configuration and tests of energy metering system Iton SL7000 and power quality monitoring Alpes
technology of Switchyard 225Kv of KHOURIBGA
Project : Renewable energy Wind Turbines farms onshore
- WIND FARM HOUMA (50.6MW), 22 Siemens turbines with a unit capacity of 2.3 MW
- WIND FARM FOUM EL OUED (50.6MW), 22 Siemens turbines with a unit capacity of 2.3 MW
- WIND FARM AKHFENIR (101.87MW) 61 Alstom turbines with a unit power of 1.7 MW
Responsibility
Engineering
- Preparation of design review , project specifications and philosophy for electrical equipment
- I was also involve on Materiel procurement (preparations of material requisition ,vendor offer review ,
technical review and preparation purchase order )
- Gate review and constructability review
- Supporting Engineering team to develop GA drawing , Wiring circuit diagram , layout drawing for the
Switchyard 22KV/60KV
- Reviewed and approved Cable size study for 22KV cable (WT) for Circuit 1,2,3 and 4
- Coordination with vendors engineering department document review and approval (Schneider, Nexans, and
Siemens, AEG (UPS and batteries)).
- Review Fire and gas drawing developed by vendor (GA drawing , loop diagram , layout drawing, termination
drawing for JB and f&G Panel )
- Supporting our engineering team for Lighting/Earthing /lightening for the switchgear 22kv/60KV Drawing
- Reviewed and approved Cable routing and cable trouches was developed by our subcontractor
DELIVERABLES (OFFICE- ENGINEERING & PROCUREMENT STAGE)
- System and Subsystem Breakdown (E&I-HVAC-Telecom)
- Preparation of “Project Preservation Procedure”
- Preparation of Method Statement
- Preparation of “Operational Test Procedures” (OTP’s for energization)
- Vendor Document Review (Factory Acceptance Test “FAT”/ Site Acceptance Test “SAT”, Asset Integrity
Management System “AIMS”) “Commissioning Spares Parts, Special Tools & 2 years Warranty Spares list”
Review & Approval
- Attend Factory Acceptance Tests – issue FAT report- Track down Outstanding Punch (if any)
- Population of Pre-com & Com activities within Completion Management Database
- Establish Ready For Commissioning (RFC)/ Ready For Start Up (RFSU)/ Ready For Hand Over (RFHO)/
Provision Acceptance Certificate (PAC)/ Final Acceptance Certificate (FAC) Hand over procedure
- Establish (by priorities) Commissioning & Start up Sequences & Vendor Mobilization Schedule
- Preparation HSE Commissioning Plan (LOTO)
DELIVERABLES (SITE- CONSTRUCTION – PRE- COM & COMMISSIONING STAGE)
- Follow up the Project Equipment Multidiscipline Preservation activities
- Follow up cable pulling, termination, glanding , electrical equipment erection .
- Ensure PTW ,coordinate work with other discipline
- Supervise Cables Continuity & Insulation & Hi-Pot & Bus bar torqueing, Relay Protection Setting
Calibration, Loop testing …activities
- Attend Mechanical Completion Walk-downs by Sub system
- Follow up the Site Acceptance Testing & Mechanical Completion punch items close out & MC/RFC/ RFSU
Cert. Status
- Issue Vendor Call out Instructions
- Execute Operational Test Procedures (OTP`s)
- Attend “Pre-com & Com & Hand over” Daily Progress Meeting
- Lead Pre-Start up Safety Review “PSSR”
- Assist & Supervise Performance Test
Project 11: « Renault Tangier RTM2 » (Client RENAULT)
Responsibility
- Tests and commissioning of MV/LV PANEL (Schneider Electric)
- Designed Layout drawing of cable tray, lighting and bus duct
SNEF GROUP MAPICER Morocco (August 2010 to August 2011)
Designation (Electrical Designer/ Commissioning)
Project: Renault automobile Manufactory Tanger
- Electrical Designer of MV/LV PANEL.
- Commissioning of switchyards MV/LV 22Kv/400Vac
VIELEC SA Casablanca Morocco (July 2009 to July /2010)
Designation (Electrical Designer)
Project 1 and 2: Dam TASKOURT and OUED ELMALEH AIC métallurgie
Education
EDUCATION
MBA-Business of Management
Girne American University UAE 2021/2022
Master’s Degree: Electrical Engineering.
Faculty of Sciences and Technologies, Hassan 1st
University, Settat, Morocco 2017/2018
Bachler’s Degree: Electrical Engineering
Faculty of Sciences and Technologies, Cadi Ayyad
University, Marrakesh, Morocco 2005/2009
Professionals in the same Utilities / Energy sector as Essaid Elhabibi
Professionals from different sectors near Abu Dhabi, أبوظبي
Jobs near Abu Dhabi, أبوظبي
- Penspen Abu Dhabi
Penspen urgently looking to hire Commissioning Manager for Offshore PMC projects in Abu Dhabi UAE. · ...
- Penspen Abu Dhabi
Penspen is urgently looking to hire Commissioning Manager (Offshore WHTs, Subsea Cable & Piping, B/Fs) for one of our Offshore PMC projects in Abu Dhabi, UAE. · The candidates should have Bachelor's degree in Engineering (Mechanical, Electrical, Instrumentation or related). · Re ...
-
Specialist Commissioning
2 weeks ago
Penspen Abu DhabiLead and execute pre-commissioning and commissioning activities for process and utility systems at the fabrication yard. · ...