About Naseem AHMAD PMP:
An Engineering Graduate with 12years of experience in Offshore/Onshore projects in Engineering, Design, FEED, Instrumentation & Control, Project Planning & Execution, Installation and Refinery Shutdown, Pre-commissioning, Commissioning, start-up and Technical Services. Strong analytical, management, communication and organizational skills. Previously worked with ALTRAD/ADYARD Abu Dhabi LLC with ADNOC offshore projects as a Project Engineer-E&I. Proficient in managing the Engineering, Design, FEED, Project management, Risk Management, 3D model workshop, Project Execution, installation, Pre-commissioning, Commissioning and start-up, testing & maintenance of a wide range of Process Control, Instrumentation & Control Systems. Adept in conducting tests, streamlining processes to facilitate smooth operations, reduce costs & enhance productivity for enhanced operations. Skilled in Engineering, Design, FEED, Procurement, Construction & Commissioning of Instrumentation & Control systems & calibration of various instruments in process variables such as Level, Pressure, Flow and Temperature.
Experience
Current Projects: UPPER ZAKUM – TOP SIDE MODIFICATION FOR NEW GAS LIFT FACILITIES for WHPT PC-75, PC-20, PC-80 AND PW-32- EPC WORKS
PROJECT No. E1201B2: TOPSIDE MODIFICATION FOR NEW GAS LIFT FACILITIES AT UPPER ZAKKUM (Offshore)
Client: ADNOC OFFSHORE Central Island
PRIMARY DUTIES AND RESPONSIBILITIES:
- Responsible to assist the Project manager for interfaces and follow ups within ADYARD and client for accomplish of the project.
- Assist PM in day-to-day project activities.
- Coordinate and expedite between departments.
- Specialized in organizing, administrating, coordinating of all elements in the construction process.
- Excellent communication and interpersonal skills, plus ability to manage a team of varied disciplines.
- Hands on Experience in Oil & Gas Projects ‐ E&I Engineering, Planning, Construction and Procurement.
- Overseeing day to day operations of the project and monitors the work progress.
- Clearly understanding the scope of project and preparation of project plan and schedules.
- Focal point with client for all manpower, resources coordination.
- Worked with vendors to complete projects according to schedule and specifications & negotiated to reduce the budget up to 15%.
- Improved team productivity by 40% through diligent procedures and work instructions
- Supporting project manager in the project management, implement cost control technics.
- Managing all project elements ‐ engineering, construction, procurement, T&C and final hand over.
- Succeeded in managing the project within budget and time.
- Monitor critical activities based on the project schedule and advise management.
- Participate in project meetings and discussions with the Client as required.
- Tracking project actual cost versus budgeted cost.
- Follow up with clients on routine matters.
- Coordinated between site construction and yard fabrication.
- Prepared and submitted documents to ADNOC team for Barge inspection
Current Projects: Berri Gas Plant, King Fahad Industrial Port, Jubail Saudi Aramco. (Offshore)
- LSTK Project-BI-10-000688: Upgradation of Sulfur forming & Export Facilities.
Client: Saudi Aramco
PRIMARY DUTIES AND RESPONSIBILITIES:
- FAT, SAT, Pre-commissioning and commissioning activities.
- CDR, PDR review to comply with Saudi Aramco Material Specification and Standards for DCS/ Control System Hardware and Software.
- Involve in Interposing Relay Panel (IRP) design and manufacturing.
- Modification in the existing Control System hardware to meet the customers’ needs.
- DCS-Yokogawa Centum VP, Prosafe ESD, Triconix ESD System hardware integration, Interposing Relay Panel Design and Integration.
- Review and preparation of loop drawings, cause and effect documentation, Instrument index, DCS / PLC’s, I/O list, Instrument Datasheet, Junction Box Termination detail, Cable Schedule, Cause and Effect Table, Functional Logic diagram, Level Sketches, Loop folder, P&ID’s, Hook ups, As-built Documentation.
- To establish design criteria and specifications for Control Systems & Instrumentation in accordance with the project requirements with JACOB ZATES.
- Identify & analyse design changes & modify design drawings & documents accordingly with JACOBS.
- Modifications/addition of High Sensitivity Smoke Detector FSL-751 in the existing NOTIFIER Fire Alarm System.
Dec’15- June’ 17 with Saudi Aramco Riyadh Refinery through M.R Al Khathlan EPC Company as a Project Engineer Instrumentation
Projects: Riyadh Refinery, Saudi Aramco. (LSTK Projects)
- LSTK Project-BI-10-000787: Upgrade Open Drainage System& installation & Pre-commissioning of new API separator at Saudi Aramco, Riyadh Refinery.
- LSTK Project-BI-10-001091: Upgrade Close Drainage & Dewatering System at Saudi Aramco, Riyadh Refinery.
- Shutdown activity of Riyadh Refinery for 90 days.
Client: Saudi Aramco
PRIMARY DUTIES AND RESPONSIBILITIES:
- Execution & Monitor total instrumentation & Electrical activity as per scope of work.
- Identify and notification of change order scope.
- Preparation of change order notification to Saudi Aramco.
- Involve procurement, NMR review, redline drawings preparation.
- Preparation of technical query regarding missing information.
- Witness the Inspection and Testing of DCS System, ESD System and Interposing Relay Panels.
- Extensively involve in the procurement activities of Control System, Gas Detection System, ESD, Field Instruments, Cables, Valves and Accessories etc.
- Handle the tasks of preparing and maintaining system instrument databases as well as preparing project workflow and estimation of project budget.
- Performed the responsibilities of preparing graphics for control systems to meet the system requirements.
- During the Construction phase, assist in ensuring that technical standards and specifications are complied with work execution.
Feb’14-Aug’15 with LARSON & TOUBRO through LEASECON QATAR as Instrumentation Engineer
Key Project Handled
Project: Export Gas Compression Facilities Upgrade, Ras Laffan Qatar (HRSG & GAS Turbines upgrade)
Client: Dolphin Energy Ltd.
Role: Handled a gamut of project related activities encompassing;
- End to end project management from planning to site mapping to monitoring on-site activities & final execution of projects.
- Monitored projects with respect to Cost, Resource Deployment, Time over-runs and Quality Compliance to ensure execution of projects within the time & cost parameters.
- Handled instrumentation operation for a wide range of control systems & instruments.
- Reviewed & prepared project documents instrument datasheet, junction box details, cable schedule, cable tray layout, instrument location layout, ITR/SS/CCR equipment layout, hook-up drawings, fire & gas layout, telecommunication layout, functional design specification, instrument index, i/o list, cause & effect table, functional logic diagram and loop diagram.
- Involved in preparation of method statements & manual for EPIC contracts to ensure compliance with Codes, Standards and Company requirements.
- Handled installation, calibration of instruments like transmitters, pressure switches, level switches, control valves, temperature sensor, fire & gas detector, ultrasonic flow meter & element and motor operated valves.
- Involved in installation & commissioning of;
- Cable tray, Panel, JB, Cable Laying, Earthing, Panel Wiring, glanding, Termination, Tubing.
- Field instrument, instrument panels, package instruments/panels, gas metering custody transfer system.
- Gas detectors IR detector point type and open path, Catalytic type gas detector, Heat detector, smoke detector, Beam detector, VESDA, VESDA duct type.
Jun’12-Jan’14 with Makamin Petroleum Services Company as Project Engineer/Instrumentation Engineer
Key Project Handled
Project: Low Pressure Production Header(Installation &commissioning); Installation of MPFM (Multi Phase Flow Meter) and PDHMS installation and commissioning.
Client: Saudi Aramco
Role: Looked after various activities including.
- Support Instrument maintenance team in planning/execution of preventive maintenance, corrective maintenance and field testing when required.
- Visit the work sites, investigate and analyze complex technical issues to resolve maintenance problems.
- Provide technical support to the field supervisors, contractor's supervisors and technicians when required in their respective areas to implement the job safety and cost effectively to the specified quality standards
- Handled business development & project management activities; coordinated with clients for new project scope in particular for FEED and supervised structural fabrication.
- Responsible for managing the manpower & equipment chart according to the requirement of the project; prepared technical queries & proposal.
Jul’09-May’12 with Das Offshore Engineering Pvt. Ltd. as Instrument Engineer
Key Project Handled
Client: Hindustan Petroleum Co. Ltd.
Role: Handled various activities pertaining to;
- Involved in calibration, loop checking, testing& overhauling of various process instruments, level switches, level controller, control valve, pressure transmitter, level transmitter, flow transmitter and temperature transmitter.
- Handled instrumentation-SCADA & RTU’s operation.
- Looked after maintenance activities like troubleshooting, shutdown valve, and blow down valves and repairing of instrumentation & instruments bench calibration.
- Oversaw maintenance of below instruments,
- Different type of transmitters, pneumatic transmitter, analysers and conductivity transmitters, I/P & E/P, Control valves, ON OFF valves, all type PSV, Vibration switches & Process switches
- Type of I/P converter (Foxboro, Masoneilan, Honeywell, Fisher, Rosemount, ABB) & standard calibration in instrument lab & complex
- Handled preventive maintenance, trouble shooting of turbine boiler instrumentation and loops; involved in configuration of Electronics PID (Honeywell, Foxboro and Yokogawa) controllers.
- Pressured leak test for impulse tubing, ESD system Fusible plug, Valves seat leak testing, pressure gauges, vacuum gauges, compound gauges & temperature gauges; calibration for Hydro testing crew.
- Responsible for checking of Sensors, Limit switches, Solenoids, Proximity switches, Pneumatic Relays, Boosters, Trip valves & Transducers.
- Preventive Maintenance of plant instrumentation.
Education
- Bachelor of Engineering in Instrumentation & Control Engineering
- Post graduate Diploma in Automation
- Project Management professional (PMP)