About SAYED ZIA HAIDER RIZVI:

Heaving nearly 24 years of experience in managing different phases of quality operations. Capable of handling multiple projects at a time with minimum supervision. Managed the accountability of quality across every activity and robust expertise in all aspects of engineering construction interfacing the multidisciplinary processes.                   

Experience

Company VOLTAS (IOBG) -Jan 2012 to July 2020

Voltas-IOBG is a TATA Enterprise dealing with MEP Projects around the World. 

District Cooling Plant Barsha Height Dubai (Jan-2019 to July 2020)

DCP at Barsha Heights is a Leed V3 project with Basement+2+R in a plot area of 31,010 Sq.ft with a Total Gross Floor Area of 54,472 Sq.ft. with Nine 11 kV feeders from Nine RMU with Four Chillers directly feeding on 11KV through RVSS from MVSWG and there are Nine Transformers of 11/.4KV, 1.5/2MVA connected with. The total Demand Load of the project is 24.75MW. The pieces of equipment selected are industrial grade types fully interfaced through MODBUS & integrated through SCADA System.

client                            EMPOWER 

Consultant                     DC PRO.

Main/MEP Contractor Voltas

Project cost                   136 Million AED 

Worked as Sr. Q.A/Q.C Engineer (MEP)

Viva Bahriya  Doha Qatar (July 2016 to Dec 2018)

The project consists of 2 no’s of 24-story residential towers at The Pearl Qatar, Doha, Qatar.

Client                            The Land 

Consultant                     SHAKER.

Main Contractor            Redco Almana

MEP Contractor            Voltas

Project cost                   110 Million Riyal (Approximate) 

Worked as Sr. Q.A/Q.C Engineer (MEP)

Workers Hospital & Integrated Health Center Industrial Area (WHIC)-Doha Qatar (Apr 2014 to June 2016)

 The hospital has 120 beds, the hospital has an outpatient clinic with surgery, radiology, and laboratory facilities besides offering ambulance and ancillary services. The project also includes an independent health center, a health center attached to the hospital, and a medical commission unit.

Client                            Private Engineering Office 

Project Management   Hill International

Consultant                     Dar Al Handasah.

Main Contractor            Midmac

MEP Contractor            Voltas

Project cost                    240 Million Riyal (Approximate) 

Worked as Sr. Q.A/Q.C Engineer (Mechanical), Hospital & Research Center in DOHA Qatar

Sidra Medical and Research Centre (SMRC)-Doha Qatar (Jan 2012 to March 2014)

Sidra Medical and Research Center (Sidra),  a landmark development, planning to focus on three primary areas: patient care, medical education, and biomedical research. Sidra Medical and Research Center is an ultra-modern, all-digital academic medical center. 360 inpatient beds, Clinic Building including multi-level car park, underground car park, and central plant room.

Client                            Qatar Foundation / Qatar Petroleum. 

Project Management    ASTAD

Consultant                     KEO International Consultant.

Main Contractor            OHL / Contrak (JV Joint Venture).

MEP Contractor            Voltas / Kentz (JV Joint Venture)

Project cost                    800 Million Riyal (Approximate)

Worked as Sr. Q.A/Q.C Engineer (Mechanical), Hospital & Research Center in DOHA Qatar

CompanyEmirates Technical Associates, M & E Division, a Leading Electro-Mechanical Contracting Company in UAE.  May 2003 to Dec 2011

Cleveland Clinic: - Abu Dhabi UAE. (August 2010 to Dec 2011)

Cleveland Clinic: - Abu Dhabi UAE. This project involves the construction of a 24-story hospital that will contain 7-star amenities, 360 inpatient beds, and a 324 room clinic that will have over 3, 200 car parking spaces. It will include a multi-specialty tertiary care center, an adjacent clinic, a central utility plant, and multi-field departments including cardiovascular, digestive, neurosciences, oncology, ophthalmology, orthopedics, pulmonary, and urology units.

Owner                                     Mubadla Healthcare

Developer                                Aldar Properties

Project Manager                     Jacobs International

Lead Consultant                     AEDAS

Engineering Consultant         AECOM

Consultant:                             KEO International

Contractor                               Six Construct & Samsung Joint Venture

Project cost:                            1.6 Billion AED (Approximate) 

Worked as Sr. Q.A/Q.C Engineer (MEP), a luxury 7-star Hospital in Abu Dhabi                                        

Khalidiya Palace Rotana Hotel & Residences: - Abu Dhabi UAE. (August 2006 to July 2010)

Client                                      PD of HH. Sh. Mohammad Bin Khalid Al Nahyan

Project Manager                     EC Harris

Consultant:                             Khatib & Alami Consolidated Engineering Company

Contractor                              Nurol

Project cost:                           160 million AED (Approximate) 

Worked as QA/QC Engineer (MEP, A luxury 5-star hotel & 3 Residential Tower in Abu Dhabi 

Between The Bridge Hotel- Abu Dhabi UAE (Jan 2006 to July 2006)

Client                                      Al Jaber & Tourism Authority

Consultant:                              K.E.O International 

Contractor                               ALEC 

Project cost:                            20 million AED (Approximate)

Worked as QA/QC Engineer (MEP), A luxury 5-star hotel in Abu Dhabi (UAE).

Six Tower Residential Building -Abu Dhabi UAE (Jan 2005 TO Dec 2005)

Client                                       Private Building Est. & International Capital Trading L.L.C

Project Manager:                     Turner 

Consultant          :                    Ian Banham 

Contractor                               Civil Co

Project cost:                            39 million AED (Approximate)

Worked as an HVAC Site Engineer. Six luxurious Residential towers in Abu Dhabi. (UAE).

Emirates (Conference ) Palace Hotel -Abu Dhabi UAE. (May 2003 to December 2004)

Project Manager:                   Turner

Consultant          :                   KEO

Project cost        :                  300 million AED (Approximate)

Worked as Q.A/Q.C Inspector (Mechanical), A luxury 7 Star Hotel & Palace in Abu Dhabi (UAE)

Company- Blue Star Ltd, Lucknow, UP. (September 1996 to April 2003)

Worked as a Site Engineer and executed Projects in India. (HVAC) (Feb 2001-Apr 2003)

Hotel Ashoka, Mall Road, Varanasi, U.P India (Five star hotels)

Project cost:                             Rupees 15 million (Approximate)

Hotel Radisson, Mall Road, Varanasi, U.P India (Five-star hotel)

Client                                      Radisson Group

Project cost:                            Rupees 19 million (Approximate)

(Jan 1998 – May 2001)

Kamayani Hospital Agra, U.P. India 

Project cost:                            Rupees 5 million (Approximate)

Jwala Theatre, Agra, U.P. India

Project cost:                            Rupees 2 million (Approximate)

Indian Oil Refinery Mathura

Quality Control Lab, Mathura Refinery, Mathura, U.P. India

Client                                      IOCL

Project cost:                            Rupees 4 million (Approximate)

O.M & S. Ist Control Room, Mathura Refinery Mathura, U.P.

Client                                      IOCL

Consultant                               EIL

Project cost:                            Rupees 4 million (Approximate)

Administration Building, Mathura Refinery, Mathura, U.P. India

Client                                      IOCL

Project cost:                            Rupees 20 million (Approximate)

 (Sept 1998 – July 1999)

Sheetal Hospital, Barely, U.P. India

Project cost:                            Rupees 4 million (Approximate)

Commercial Motor, Barely, U.P. India

Project cost:                            Rupees 2.5 million (Approximate)

(Sep 1996 – Dec 1998)

U.P.S.E.B. Substation 400kva, Agra, U.P. India 

Client                                      U.P Electricity Board

Contractor                              Crompton Greaves Ltd. 

Project cost:                            Rupees 3.5 million (Approximate)

Anjana Theatre, Agra, U.P. India 

Project cost:                            Rupees 2 million (Approximate)

Agra International Airport, Agra, U.P. India)

Client                                      Air Port Authority of India

Project cost:                            Rupees 20 million (Approximate)

Other Technical Proficiency

  • Lean Six Sigma (Yellow,  Green & Black Belt except for Master Black Belt)
  • Certified External/ Internal Quality Auditor
  • Conducting  Internal audits for the Company  (Yearly at least 2 Audits)
  • Planned for the Material Submittal, Drawing Submittal, Procurement date, Delivery date.
  • Monthly Invoice, Variation & taking approval from Consultant.
  • Knowledge of Air Conditioning systems, Drainage, Water Supply & Fire Fighting Services.
  • HSE activity at a site in coordination with Safety Officer.

Responsibility

•Reporting to SR QA/QC Manager for coordinating the Project Quality Matters, also reporting to Project Director for implementing the Project Quality Plan and Supervision to project works to ensure that the installation, testing, and commissioning are carried out in the correct manner. 

•Preparation of PQP, Method Statement, QA/QC documents, and Inspection & Test Plan for MEP services after coordinating with concerned engineers for Safety, Quality & Environmental issues. 

•Prepare all necessary documents and attachments for the inspection and testing requirements.

•Review the mechanical/electrical works checklist, as-built drawing, and related quality control documents for the final drossier.

•Inspect the material received from the supplier to ensure that material is according to the specification & offered the same for Consultant Approval and follow up with the consultant till approval

•Site inspection and co-ordinate to construction to implement the work completed in compliance with code in accordance with the specification. Coordinate inspections with Consultant / Client and communicate with project team

•To arrange MEP work inspection with the consultant after internal inspection of work.

•Coordinate with client for inspection activities issued RFI (Request for inspection) for witness/hold point etc.

•Report deviations from approved plans and specifications.

•Review all materials received on the site, inspecting them, ensuring they are as per approval.

•Conduct testing within the required specification and monitor the frequency of testing.

•Attend and participate in QA/QC meetings.

•Proactively supervise the closure of NCRs, suggesting innovative ideas for improvement.

•Liaise with the construction execution team management resolving problems quickly and efficiently.

•Overall quality supervision for MEP works.

•At site inspection time, follow safety rules & regulations at different hazards areas.

•Comply, implement and participate in the improvement of established ISO QMS & EHSMS procedures/ documentation and maintain records keeping.

•Ensuring that construction, installation, and operational testing conform to functional specifications and customer requirements.

•Supporting and promoting all QHSE policies and procedures implemented by the company.

•Reviewing material submittal and its compliance statement before forwarding to consultant’s approval.

•Reviewing shop drawings before submission to consultant Preparing O & M Manuals in coordination with the site management team.

•Inspecting sites daily with consultants.

•Maintaining a log and visiting to store with the consultant for permanent material inspection.

•Coordinating for External Quality Audit & Internal Quality Audit.

•Conducting Internal audits for the company (other projects / other departments) 

•Interacting with the project team on Quality requirements.

•Completing the testing and commissioning tasks at the project as per project progress.

•Maintaining all QA and QC documents legible.

•Conducting the factory visit for inspection of different materials like Duct, Fabrication of Pipe, etc. before dispatching to site.

•Helping to prepare material submittal for Consultant approval.

•Reviewing, checking & assuring all documents & drawing for sublimation.

•Controlling all approved documents related.

•Coordinate with the main contractor’s Quality Control Manager/ Quality Control Engineers to obtain the approval of quality system documentation related to the project.

•Preparation of Method Statement, Quality Control Procedure, and Inspection & Test Plan for MEP services after coordinating with concerned engineers for Safety, Quality & Environmental issues. 

•Coordinate with Purchase Department / Supplier / Manufacturer for the document required for the Material Approval

•Monitoring & implementation of QA/QC functions in accordance with the approved Project Quality Assurance Plan. Raising site observations / internal NCR to site engineers.

•To monitor measuring & testing equipment status to ensure that only calibrated equipment is issued & used by staff.

•Preparation of Monthly QA/QC report & Monthly Score Card.

Education

Certifications

PMP Certification                                                                                    Pursuing 2022

Certified Quality Manager                                                                     2022

Certified Internal Auditor QHSMS ISO 45001-2015                          2022

Certified Internal Auditor EMS ISO 14001-2015                                2022

Certified Lean Six Sigma Green Belt & Black Belt                               2021

Certified Lead Auditor QMS ISO 9001                                                   2018

Certified Internal QMS Auditor ISO 9001                                              2009 

Educational Qualification  

B Tech (Mechanical), RVD Rajasthan                                                     2015     

PG Diploma (TQM)                                                                                     2009 

Diploma in Mechanical Egg, U. P. Tech. Board                                      1996   

PGD Computer Applications, Lucknow                                                   1996

B.Sc.(Mathematics & Statistics), Lucknow, University                         1992 

Professionals in the same Construction / Facilities sector as SAYED ZIA HAIDER RIZVI

Professionals from different sectors near Dubai, دبي

Other users who are called SAYED ZIA HAIDER

Jobs near Dubai, دبي

  • mepcontracting2017@gmail Dubai

    This is a full-time on-site role for a MEP QA/QC Engineer located in Dubai. The QA/QC Engineer will ensure quality and safety standards by conducting inspections, tests and audits. · ...

  • Access hr sollutions Dubai

    Responsible for ensuring all MEP works are executed inspected tested and handed over as per approved drawings specifications and UAE authority requirements. · ...