Well Site Geologist - Dubai, United Arab Emirates - PPBosun

PPBosun
PPBosun
Verified Company
Dubai, United Arab Emirates

1 week ago

Ahmed Al-Mansouri

Posted by:

Ahmed Al-Mansouri

beBee Recruiter


Description

Job Title:
Wellsite Geologist


Experience level:
Experienced


Location:
Iraq


Language:
English fluent level


Start Date:
Immediate Vacancy


Qualification Requirements

  • Degree in oil and gas geology
2. 10+ years of work experience in oil and gas industry


  • Minimum 5 years work experience as Well Site Geologist in international oil companies;
  • Work experience in South Iraq projects is plus;
  • Experience of managing drilling problems such as mud losses (including total losses), stuck pipe, pack-off;
  • Experience in Wireline/LWD/MWD operations including on-site stratigraphic correlation (based on cuttings, well logs etc.);
  • Experience in coring operations including on-site core description;
  • Experience of working in multicultural environment to be open and transparent communicator in diverse multidiscipline team;
  • Reduce nonproductive time due to unappropriated mud logging services in well construction;
  • Reduce mud logging service time by way of optimizing process solutions;
  • Monitor the mud logging company's HSE performance to ensure that all operations are executed safely and responsibly according to rules;
  • Responsibility to inform the Drilling Contractor, Drilling Supervisor and the Geology Superintendent in case of inadequate performance rules;
  • Advise on suitable corrective action but must not take the responsibility to implement such action of directly supervise the mud logging contractor personal. This is the responsibility of the mud logging contractor;
  • Review compliance of the Mud Logging Contractor to his policies and procedures the safety checks, inspections and incident investigations conducted by the contractor, including the timely closeout of remedial actions;
  • Generally, observe for compliance with safe working practices (e.g. safe lifting and slinging, welding, working at height, use of PPE, etc.);
  • Maintain accuracy of Paperwork reporting. Comply with the requirements of the reporting system;
  • Require and monitor the Mud Logging Contractor to an integrated service for the wells drilling, to ensure the proper order on the Rig site.
  • Control Mud Logging sensors and Unit rigup, control tools/equipment/sensors calibration and Mud Logging unit startup. Sign commissioning act after startup;
  • Monitor the availability and completeness of Mud Logging Contractor's equipment before performing various operations on the well;
  • Control all operations carried out by Mud Logging contractor on the well, including but not limited to data quality control, mud logging unit sensors and equipment technical conditions;
  • Control on daily basis technology and geology data quality provided by Mud Logging contractor, sensors calibrations prior drilling each well sections;
  • Monitor the mud logging contractor performance to ensure that all operations are executed according to service contract scope of work and drilling program;
  • Control accuracy services provided for payment performed services by Mud Logging contractor;
  • To coordinate the collection of all data to be transmitted by Mud Logging contractor to Geology & Reservoir Engineering Directorate and IOC and to ensure the correctness, content and quality of such data;
  • Control drill cutting sampling, description, lithobituminological analysis and photo by Mud Logging contractor as per drilling program;
  • Monitor of washed and unwashed drill cutting packing and preparation for transfer to Drill Cutting storage for permanent storage;
  • Organize and control core processing by coring contractor on a wellsite;
  • Perform preliminary core and core chips description during core processing on a wellsite;
  • Ensure all well drilling, MWD/LWD logging and coring programs are fulfilled;
  • Take part and control coring operations, LWD/MWD logging and downhole sampling by contractors;
  • Monitor pore pressure data on site; Direct involvement in critical operations such as: well control situations, casing jobs, casing test, drill outs, displacements, stack landing and disconnect, stuck pipe ops;
  • Perform geology and lithostratigraphy analysis of drilled formations based on drill cuttings, gas data, MWD/LWD, wireline log est.;
  • Analyze and compare all available data obtained during drilling the offset wells;
  • Analyze and compare all data obtained during well drilling;
  • Evaluate possibilities of incidents during drilling of the formations, takes early preventive for avoidance. Inform Drilling Supervisor about potential problems occur during drilling (mud losses; swellable clays; caving shales ets.);
  • Suggest casing, coring, and sampling points according to well drilling program;
  • Analyze geology data to define possible oil/gas bearing intervals outside main productive formations;
  • Collect and prepare geology reports, list of reports and reporting time shall be amended by Company;
  • Download geology information and reports in to corporate file data base;
  • Attachment of geology and mud logging reports files received from Mud Logging Co

More jobs from PPBosun