senior architectural designer design qs specialist - Dubai, United Arab Emirates - Duncan & Ross

    Duncan & Ross
    Duncan & Ross Dubai, United Arab Emirates

    Found in: Talent AE A C2 - 1 week ago

    DUNCAN & ROSS background
    Description
    • Completeness: Each chapter(discipline) of the project must adhere to the requirementsprovided below. Common sense should prevail, considering thatprojects may vary in purpose, size, and complexity. Theproject's composition should align with theproject's goals.
    • ComprehensiveDetailing: The project must encompass all aspects of thearchitectural design. Every building, structure, portacabin, orcontainer details should be presented with the required level ofdetail to prevent errors during the production or assembly ofcomponents.
    • Consistency among disciplines: Afundamental principle is that the architectural section (AR) servesas the lead section of the project documentation. The AR section isdeveloped first and acts as a reference for related sections.Amendments or changes in the AR section may be made in coordinationwith the chief architect or project author to ensure consistencywith other sections.
    • Compliance with (indescending order of importance):
      • Sales ordermaterial schedule (cost of materials is determined on an earlytender stage and cannot be recommended / commented to be changedwithout written AMBs approval.
      • Saudi Arabian orUnited Arab Emirates BuildingCodes
      • Client's requirements (technicalbrief or AMBs sales order)
      • Client'sMaterial Approval Forms (MAFs) and project documentationsections
      • Internal AMBdocuments
    • BIM Quality:The integrated multidisciplinary model must have a level of detail(LOD) not less than:
      • "For Clientsapproval" - LOD 300
      • As-BuiltDocumentation - LOD 500