About Karthik Ramakrishnan:
In quest of challenging assignments in the areas of Welding / Painting / NDT Inspection, preferably in Oil & Gas Industry
Location Preference: Africa / Offshore / Middle East / India
- A competent professional with 15+ years of experience in the field of Engineering /Welding Inspection/ Quality control / Quality Assurance in the Mechanical construction of Petrochemical, Refinery, Pipeline and Gas plant Projects in Middle East and India.
- Possess strong analytical skill with strong communication and team- work skill. Respond well under pressure with proven ability to liaise in confident and articulated manner at all levels.
- Currently associated with Bureau Veritas, Abu Dhabi as Inspection Engineer
Experience
- Possess strong analytical skill with strong communication and team- work skill. Respond well under pressure with proven ability to liaise in confident and articulated manner at all levels.
- Process Piping works for Oil Gathering Stations and Gas Plants, Petro-Chemical Plants, Power Plants, Remote Manifold Stations as per ASME B31.1, B31.3, ASME Sec IX, fabrication, Erection, line-walk, Pressure Testing & Reinstatements etc. Piping materials worked with CS, LTCS, SS, Low Alloy Steel, Inconel,
- Offshore/Onshore Pipelines for Transportation of Oil & Gas products as per DNV-OS-F101, API 1104 and Clients Specification. Worked for pipe line project for ADMA-OPCO Abu Dhabi Offshore.
- Riser Tie-ins with topside piping, Flooding Cleaning & Gauging, Hydro-testing, Caliper & intelligent pigging, De-watering of Subsea pipeline.
- Construction & Installation of Offshore Structure from Jacket Positioning, Drilling, Grouting, decks, modules, bridges, topsides platforms, riser fenders, boat landings & barge bumpers as per EEMUA 158, AWS D1.1 and client specifications.
- Inspection of Raw Materials such as Plates, Pipes, Fittings and Flanges and Bought-out items like Valves, Piping Hanger supports. Review of Raw Material Certificates, release notes and quality documents requirements.
- Interpretation of Radiographic Films , Witnessing / Interpretation of Ultrasonic Testing of Welds, Plates, Pipes, Forgings, MT/PT of welds and Destructive Testing.
- Witness GRE bonding & lamination checks, hardness test, hydro-test of GRE lines(glass reinforced epoxy)
- Reviewed As-built reports, Management of change (MOC), corrective action reports (CAR), equipment and personnel certifications & approvals. Discussed repair rates and nature of defects with welding superintendents etc. Job includes monitoring inspectors’ field reports, attending daily progress meetings, CAR follow-ups.
- Attending safety meetings, reviewing Job safety analysis-JSA, accident/incident reports, raising near miss reports, Monitored contractor’s safety health implementation and assisted in audit and improvement.
Equipment and pump installations , Preliminary and final pump alignment inspection & Hot alignment inspection
<!-- /* Font Definitions */ @font-face {font-family:Wingdings; panose-1:5 0 0 0 0 0 0 0 0 0; mso-font-charset:2; mso-generic-font-family:auto; mso-font-pitch:variable; mso-font-signature:0 268435456 0 0 -2147483648 0;} @font-face {font-family:Latha; panose-1:2 0 4 0 0 0 0 0 0 0; mso-font-alt:Courier; mso-font-charset:1; mso-generic-font-family:roman; mso-font-format:other; mso-font-pitch:variable; mso-font-signature:262144 0 0 0 0 0;} @font-face {font-family:Latha; panose-1:2 0 4 0 0 0 0 0 0 0; mso-font-alt:Courier; mso-font-charset:1; mso-generic-font-family:roman; mso-font-format:other; mso-font-pitch:variable; mso-font-signature:262144 0 0 0 0 0;} @font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-469750017 -1073732485 9 0 511 0;} /* Style Definitions */ p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-fareast-font-family:"Times New Roman"; mso-bidi-font-family:Latha; mso-fareast-language:EN-US;} p.MsoListParagraph, li.MsoListParagraph, div.MsoListParagraph {mso-style-priority:34; mso-style-unhide:no; mso-style-qformat:yes; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:.5in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-fareast-font-family:"Times New Roman"; mso-fareast-language:EN-US;} .MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:10.0pt; mso-ansi-font-size:10.0pt; mso-bidi-font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-hansi-font-family:Calibri; mso-bidi-font-family:Latha;} @page WordSection1 {size:8.5in 11.0in; margin:1.0in 1.0in 1.0in 1.0in; mso-header-margin:.5in; mso-footer-margin:.5in; mso-paper-source:0;} div.WordSection1 {page:WordSection1;} /* List Definitions */ @list l0 {mso-list-id:717896447; mso-list-type:hybrid; mso-list-template-ids:-84216134 67698689 481598800 67698693 67698689 67698691 67698693 67698689 67698691 67698693;} @list l0:level1 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Symbol;} @list l0:level2 {mso-level-start-at:0; mso-level-number-format:bullet; mso-level-text:-; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:"Times New Roman","serif"; mso-fareast-font-family:"Times New Roman";} @list l0:level3 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Wingdings;} @list l0:level4 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Symbol;} @list l0:level5 {mso-level-number-format:bullet; mso-level-text:o; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:"Courier New";} @list l0:level6 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Wingdings;} @list l0:level7 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Symbol;} @list l0:level8 {mso-level-number-format:bullet; mso-level-text:o; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:"Courier New";} @list l0:level9 {mso-level-number-format:bullet; mso-level-text:; mso-level-tab-stop:none; mso-level-number-position:left; text-indent:-.25in; font-family:Wingdings;} ol {margin-bottom:0in;} ul {margin-bottom:0in;} -->
EMPLOYMENT HISTORY
May’17-till date with Bureau Veritas, UAE as Inspection Engineer
Project Executed - NASR Full Field Development EPC packages III (Project 181401) Das Island
- The project comprises engineering, procurement and construction of modules, fabrication, transportation, construction and commissioning of island surface facilities (EPC-1 & EPC- 3) on DAS Island. Specifically, this will include new steam boiler with deration packages, crude oil process facilities, water injection and gas lift, oil export pumps, power generation and associated utilities.
- Umm shaif process plant production facilities comprising removal of existing and installation of new upgraded internals for 14 separator and Internal lining of painting. Replacement of sour charge heaters, product pumps, Installation of additional charge pump.
- Umm shaif process plant production facilities comprising removal of existing Flare US 3A & US 4 and new Flare stack Installation and Associated piping
- Umm shaif process plant production facilities comprising removal of existing Pumps, Heat Exchanger Stripper 100,200,300 & 400 and installation of new system and associated piping and testing, commissioning ,reviewing the sign off documents .
- Main oil line 16’’ MOL pipeline (1.5 Km) along with valve pit at onshore and pig receiver and Tie-in interface with offshore MOL Line.
Project Executed - Bu Hasher Full Field Development EPS Project 5231 Das Island and Offshore
- Project Overview The project comprises engineering, procurement and construction of modules, fabrication, transportation, construction and commissioning of island surface facilities (Bu haseer Full field development) on for DAS Island and Offshore Installation. Specifically, this will include Main oil line, Pig receiver, associated structure Erection, Crude oil process facilities and associated utilities.
- Main oil line 12’’ MOL pipeline (1.5 Km) along with valve pit at onshore and pig receiver and Tie-in interface with offshore MOL Line.
- Offshore Top Side Installation For Bu-Haseer Project BH-WHT-1 @ Barge HLS-2000
Project Executed - NASR Full Field Development EPC packages I (Project 3291) Offshore
- Top Side Installation for 7 no’s of new Wellhead Towers (WHTs 3, 4, 5, 6, 7, 8 & 9)
- New Risers & Infield pipelines between new WHTs & NSMFT
- Involve during flooding, cleaning, gauging, hydro testing, caliper & intelligent pigging, de-watering and drying of subsea pipelines 2 no’s of new Trunk lines, a 16” Main Oil Line (MOL) from NSSC to DAS up to the first flange of valve pit & a 10” Export Gas Line (EPL) from NSSC to IGD-HAP at USSC @Barge SEP 550 on board inspection
- Brownfield modifications will include installing Risers & J-tube on existing NSMFT & Umm Shief Super Complex
- Brownfield modifications will also include Riser, Tie-ins & Receiver installation at USSC-IGD-HAP and Tie-in as per detailed scope of work for Top Side Hook up Activities.
- Fabrication and Erection inspection of Offshore Jacket Framing, Jacket Legs, Boat landing Structure Fabrication , Pile pipes and Hydro testing ,Top Module, Deck Fabrication, Material receiving inspection.
Project Executed - NASR Full Field Development EPC packages II Offshore
- Top Side Installation of Processing Platforms (GTP,SP,AP & MFT Top Elevation)
- New Risers & Infield pipelines between WHTs-01 & 02 & NSMFT
- Demolition of 16” & 18” Main Oil Line (MOL) EPS Piping Scope during Shutdown @Barge Sea fox on board inspection
- Brownfield modifications will include installing New piping and Hook up activities at NSSC WHT-1 and NSMFT
- Brownfield modifications will also include Riser, Tie-ins & Receiver installation as per detailed scope of work for Top Side Hook up Activities.
- Fabrication and Erection inspection of Offshore Top Module, Deck Fabrication, Material receiving inspection.
- N2/He Sensitive Leak Test for the New installed Piping with Existing Tie in Loops for WHT-1, GTP, SP, & NSMFT
Project Executed: Vendor Inspection for Various Clients as part of Industrial Services
Project Executed: SPD 13A Jacket Installation Project- Iran Offshore for Rosetti Marino
July’15-Nov’16 with IMCC Group of Companies, Abu Dhabi as Senior QC Inspector
Project Executed: Fabrication of Lower Turret Structure’s with TOTAL-KAMBO-ANGOLA
Aug’14-June15 with Punj Lloyd LLC, Qatar as QA / QC Engineer
Project Executed: Polysilicon Phase-I Project with Qatar Solar Technologies
Mar’13-Aug’14 with Punj Lloyd LLC, Abu Dhabi as QA / QC Engineer
Project Executed: Tie-in Project with ADCO
Sep’12-Mar’13 with Punj Lloyd Ltd. - Oman (EPCC) as QA / QC Inspector
Project Executed: CPF & WTP Up gradation Project with Occidental Mukhaizna LLC (OXY)
Apr’11-Sep’12 with Penta Global Engineering LLC, Abu Dhabi as QA/QC Engineer
Project Executed: NGL-4 Train Project with GASCO / PETROFAC
Aug’08-Mar’11 with Kharafi National KSC. Kuwait as Quality Control Inspector
Project Executed:
Title: Large Scale Steam Flood Project (27 No’s Skids)
Client: Vecco / RCCI / JO
Title: Glycol Regeneration Skids 07 Nos.
Client: Bahrain Petroleum Company / Cameron-Petreco
Title: BS-160 New Booster Station (Pressure Vessels 28 No’s)
Client: Kuwait Oil Company / Saipem- Snamprogetti
Title: Nitrogen Receiver’s (Pressure Vessels 83 No’s)
Client: ADCO / Petrofac
Title: BS-180 New Booster Station (Pressure Vessels 114 No’s)
Client: Kuwait Oil Company / Saipem-Snamprogetti (Heat Exchangers)
Jun’05-Aug’08 with DAS Offshore Engineering Pvt Ltd. Mumbai as Piping Engineer
Project Executed:
Title: PRP2 Replacement of 43 Well Platforms
Client: Leighton / Oil & Natural Gas corp. Ltd, India
Title: NRPOD up Gradation & Expansion Project
Client: Shapadu / BG Exploration & Productivity India Ltd.
Title: Revamping of 26 Well Platforms
Client: Sarku / Oil & Natural Gas corp. Ltd, India
Roles Responsibilities:
Welding/NDT
- Reviewing the PQRs, WPS, ITPs Project specifications and preparation of WPS, PQR and Qualifying welders as per relevant codes and specifications.
- Review of RT film and interpretation as per ASME Section IX, ASME Sec VIII Division I, ASME B 31.3, API 1104, AWS-D1.1, etc.,
- Witness Welder Qualification tests in association with the client. Conducting Weld Audit periodically to ensure the quality of the welding activity, Maintaining records of all welders and ensures their qualification continuity. Continuously monitoring the performance of the welders.
- Witnessing of activities like PQR, Welder’s qualification Tests, Mechanical testing and preparation of PQR records and WQT certificates.
- Compile and maintain pertinent records of inspection and testing till for a retention period contractually agreed.
- Notify the non-conformance identified during inspections and recommending corrective measures to site supervisors through QA Engineer.
- Implementation/verification of ISO quality management system.
- Material inspection for incoming materials & Review of material certificates to check compliance to project specifications
- Monitoring and witnessing for the NDT tests. Witness &review the Mechanical destructive tests.
- Fit-up checking. Field inspection with different material Carbon Steel (CS) Stainless Steel (SS), Low Temperature Carbon steel (LTCS), Low Alloy Steel includes fabrication and fit-up, welding inspection
- Witnessing Hydro testing, Pneumatic testing, Visual tests, Flushing and Drying of pipelines. Preparation for punch list.
- Documentation of all test results, approval and test procedures. Welding Inspection as per approved WPS. Witness welder qualification test Verification of welder performance qualification tests. Checking welding variable for compliance of welding procedures Verification/Monitoring of all NDE activities.
PIPING/ PIPELINE
- Line check, Line Walk, Verification of P&ID, Pressure test, Hydro test and Re instatement of all Piping and pipelines.
- Carry out Spool/Visual Inspection on Various Piping& Pipeline Welds.
- Conduct Line Check and Reinstatement inspection for the Various Piping Systems
- Witnessing Cleaning, Gauging and Flooding, Hydro test for the various Pipeline Systems.
- Monitoring Intelligent Pigging activities as per project specification and code requirements.
- Follow up Flange management Team Activities.
- Maintain and update QA/QC reports and statistical data
- Responsible to hold defective Products for the Next Process till Satisfactory remedial Action.
- Coordinate with Engineering to Raise an ITR for the required various kinds of Activities.
- Liaising with the sub-contractors, Punch listing, Issue of PCM and follow up, Inspections as per the class requirements.
- Coordinate with the clients to close those ITRs
- Raise Punch list for the outstanding items found During Inspection
- Monitoring and Closing of Punch lists and compiling the reports to make dossiers.
- Familiarize with approved drawings, governing standards and specifications
- Witnessing pre commissioning activities such Nitrogen Leak Test and Inertization test activities.
- Final Dossier Submission and Approval from Client and EPC / TPI Contractors.
Vendor inspection for various clients
Vendor inspection was done for various projects/Clients for the inspection of Pressure vessels, Piping, Pipelines, Structure, Valves, Raw materials like plates, pipes, fittings, etc.
- Check that material and equipment conforms to size, type, quantity and configurations specified in the purchase order documents and detail drawings.
- Qualification of welding procedures (WPS / PQR)
- Monitoring of welding parameters and post weld Heat treatment
- Visual inspection of fit-up, welds to ensure defect free welds
- Witness mechanical tests related to PQR at laboratories
- Witness hydrostatic tests of pipe spools and pressure vessels
- Review and endorse final QA/QC records data book
- Witnessing lab testing mechanical & chemical for Pipes & fittings as per the standards.
- Review lab reports as per standards as well as approved client ITP.
- Worked as company TPI at ADMA OPCO for Offshore Installation and Hook up Activities.
- Review the supplier's documentation for identification and feasibility to the marking and tagging on the received material, equipment, components and devices.
GRP, GRE & GRV Inspection Experience
- Inspection of Glass Reinforced Polyester (GRP) pipes, Glass Reinforced Epoxy (GRE) pipes and Glass Reinforced Vinyl ester (GRV) Pipes & Fittings at Manufacturer Factories (Future Pipe Industries, Elmaar Marinas LLC) Field fitting, Lamination & Hydrostatic Testing for various clients.
- Review the Raw material test reports for resin (Isophthalic, Epoxy & Vinyl ester), Glass Roving, Glass Chopped Strand Mat, Woven Roving.
- Witness the Qualification Test & Batch Test such as Visual & Dimensional Check, Curing Barcol Hardness, Loss on Ignition (Glass Content), Consistency (Glass/Resin Ratio), Axial Tensile Strength, Hoop Tensile Strength (Split Disc), Hydrostatic Pressure Test, Impact Resistance, Initial Specific Ring Stiffness as per BS EN, ISO, AWWA & ASTM Std.
- Witness Long Term Type Tests such as Specific Ring Stiffness Test, Hydrostatic Design Basis, Pressure Test, and Creep Test & Stain Corrosion Test.
HDPE Inspection Experience
- Visual Inspection of HDPE Pipes and Fittings.
- Verify the alignment for HDPE Pipes and Fittings
- Verify the preparation of HDPE Pipes and Fittings.
- Verify the Joint cleanliness after trimming of HDPE Pipes and Fittings
- Witness the welders qualification test in (Electro Fusion Welding) HDPE Pipes
- Surveillance the welding parameters (Electro Fusion Welding).
PAINTING
- Capable of handling all relevant international surface preparation and coating standards such as DIN, ASTM, Swedish, SSPC, NACE, British, I S O etc.
- Experience in blasting and coating inspections, pipeline field coatings and factory applied coatings.
- Conduct/monitor field testing in accordance with the relevant codes, standards, procedures, Inspection & Test Plan (ITP) and specific job requirements.
- Monitor/verify the quality testing of raw materials and production and testing records in accordance with the mill certificates & material data sheets. Inspection/monitoring of coating activities to ensure that the end products are in compliance with the requirements of the applicable codes and standards and project specifications.
Education
2005 Dip. Mechanical Engineering from Central Polytechnic College, Chennai with 68
CSWIP 3.1 Certified Welding Inspector (Certificate No. 66538 Expiry : Nov 2022)
NACE CIP-II Painting Inspector (Certificate No. 48054 Expiry : 31 Oct 2022)
Certified ASNT LEVEL II as per SNT-TC-1(A) in Liquid Penetrant, Magnetic Particle, Radiographic & Ultrasonic
UAE Driving License No : 2331739 (Automatic) Validity 12.04.2026
OPITO Certified Safety Courses in T-BOSIET / Offshore Survival (Certificate No. 52515501170717254938) Expiry on: 14 Jul 2021
OPITO Certified Safety Courses in H2S (Certificate No.52519014260817258624) Expiry on: 01 Nov 2021
Client Approval (UAE / Oman / Qatar & Kuwait)
- ADNOC Approved Third Party-Multi Disciplined Inspector (Welding / Mechanical/Painting) for Various ADNOC Projects
- ADCO (Abu Dhabi Oil Company) Certified Welding Inspector for Tie-in Project, UAE.
- OXY- Occidental Mahayana LLC Certified QA/QC Inspector for CPF & WTP Up gradation Project, Oman
- KOC- Kuwait Oil Company-Approved QC Inspector for Fabrication of BS-160 New Booster Station (Pressure Vessels 28 No’s). Kuwait
- QS Tec. - Qatar Solar Technologies Certified QA/QC Engineer for Polysilicon Phase-I Project.
- PPI / POGC- Assigned as TPA for SPD 13A Jacket Installation Project-Iran.
Professionals from different sectors near Abu Dhabi, أبوظبي
Other users who are called Karthik
Jobs near Abu Dhabi, أبوظبي
-
Senior Electrical Engineer
4 weeks ago
To ensure all team members are competency assessed and maintain the competency of the team in line with company requirements · To have single-point responsibility for all electrical engineering deliverables and ensure that they conform to all applicable engineering codes and stan ...
-
Job Description · Black Pearl Consult is seeking a highly skilled and experienced Psychologist to join our team. As a Senior Mental Health Professional, you will be responsible for providing tailored support and guidance to individuals and families, helping them navigate complex ...
-
Cloud Solutions Architect
3 weeks ago
Job Summary · The Cloud Solution Engineer will play a key role in driving customer success and adoption of Oracle's cloud solutions. This individual will be responsible for aligning with customers to understand their business needs and develop strategies to drive growth and expan ...