beBee background
Professionals
>
Dubai
Moustafa Eid

Moustafa Eid

Senior construction manager

Construction / Facilities

Dubai, دبي
(0)

Social


About Moustafa Eid:

More than 20 years in construction field with considerable experience in structural and finishing work.

Experience

More than 20 years in international companies as exapmle Arabtec, projacs and Ecc.Engineering Contracting Company LLC Dec 2017 - April 2021 Senior Construction Manager

 

UNA Apartments at Town Square Dubai

Design & Construction of Gr+2+P+9 Storey Building on Plot No. 922-9210, Al

Yalayis 2 Dubai

Client: Nshama Properties LLC

Contract Price: AED 311 Million

 

Town Square Development Plots 32 and 33

Construction, Completion and Remedying Defects of 4 Nos. Residential

Buildings (Rawda 1-14 Floors; Rawda 2- 8 Floors; Rawda 3- 12 Floors and

Rawda 4- 6 Floors) above a Common Basement, Ground and Podium Floor

Client: Nshama Properties LLC

Contract Price: AED 473 Million

 

Arabtec Construction WLL.

 

QATAR (From January 2014 until October 2017).

 

(1)  Project: Musheireb Downtown Doha, Phase -02

 

This mega project Consist of 12 buildings, including hotels, residential buildings, gallerias, retail and commercial buildings with the total cost of construction amounting to approximately 2.6 billion Qatari Riyals.

 

➢  Project Owner: Mushereib Properties ➢ Project Manager: Time Qatar ➢ Designer : Gensler. ➢ Supervision Consultant: CEG.

 

Duties / Responsibilities:

 

Finishing Manager of five buildings including Accor Hotel ( Four towers - 7, 11, 16 & 20 floors, 230 guest rooms/suites, 4 podium floors, Four basements, swimming pool, sky lounge and or related facade, landscape, plant room and roofs required finishing works.

 

And all the finishing activities for the three commercial buildings, one of them is Qatar National Bank (QNB) along with this is the subway going to Souq Waqif area.

 

(2)  Construction Manager for Alwaab City Residential Villas

 

The Project value exceeds to 500 Million Q.R. and consist of 256 turnkey residential luxury villas located in Al Waab City.

 

➢  Project Owner: Al Waab City

➢  Project Manager: Aecom

➢  Designer : ECG

➢  Supervision Consultant: Dar El Handasah

Duties / Responsibilities:

Senior Construction Manager responsible to supervise construction personnel and activities in site including all the civil, MEP and architect work from the start up to the snagging and handling over stage.

 

 

   

    .Work at Projacs International (Projects Management).

 

-        EGYPT (From 1st of Nov. 2012 till last of 2014).

 

Project Manager for Alexandria Hilton Hotel.

 

 

 

-        The project is converting Maritime Jolie Ville to Hilton.

 

-        The renovation including 10 guest floors with 160 rooms with four royal suites ,6 podium floors including all conference rooms , ballrooms , kitchens , restaurants , casino , swimming pool and offices.

-        The renovation including the main plant and all required MEP work.

 

-        The process including the fire life safety requirements as per Hilton standard.

 

-        All the specs as per Hilton product improvement plan (PIP).

 

 

 

-        Duties / Responsibilities:  -I was Responsible for Monitor and Control the Overall Construction Process.

 -Massive Coordination Process between all Project Stakeholders.

 -Putting an Eye on Time and Budget and give a Hand to Subordinators.

 -Ensure Quality, Continuity and Efficiency in The Execution Mandates.

 

-Engage in Comprehensive value Analyses and Constructability review program.

 

-Form the Smooth Operation Links so as not to impede the Progress.

 

-Supervise All Activities and The Work of Contractors for Compliance with The

Contract and Maintain Project Archives Documents, Accounts, and Correspondence.

 

-Monitor HSE Implementation in Site.

 

-Review and Initiate daily, weekly and monthly Progress Reports.

 

 

Experience:

 

.Work at Amlak El Akaria in Alexandria.

1- (From Sep. 2010 Till Oct. 2012).

PROJECTS MANAGER FOR SEVERAL PROJECTS IN ALEXANDRIA.

 

-  1ST Execution of new Hospital (10 floor).

-  2ND Execution of Residential Building (14 floor). - 3RD Execution of new Club & Resort (RCR) 120, 000 m2.

 - Responsibilities:

 

• Responsible for all sites activities from start to ending for all finishing items and follow daily 7 site engineers and their supervisors, subcontractors, labors, materials, progress, invoices, quality, etc.,

•Reviewing Architecture & Structure & MEP Drawings.

•Estimating and analyzing the cost (cash flow).

•Check calculations sheets, Time schedules and specifications.

•Negotiate and make deals with Subcontractors.

•Coordination sites (Consultants, Sub Contractors and Site Engineers).

 

2- (From February 2010 Till Sep 2010).

 

PROJECT MANAGER FOR A REAL ESTATE PROJECT IN ALEXANDRIA.

 

- Execution of (six) Residential Buildings (Each 11 Floors) Including 400 residential units, parking, Town houses and Commercial floors. - Duties / Responsibilities:

 

•Follow construction activities in site.

•Reviewing Architecture & Structure & MEP Drawings.

•Estimating and analyzing the cost (cash flow).

•Check calculations sheets, Time schedules and specifications.

•Negotiate and make deals with Subcontractors. •Coordination sites (Consultants, Sub Contractors and Site Engineers).

 

 

   

-.EGYPT (From January 2008 Till February 2010).

.Work at Sectors Contracting in Cairo.

 

PROJECT MANAGER FOR LE-LIDO CLUB IN CITY VIEW RESORT.

 

•Work as a project manager for a high finishing healthy club 15000 m2. •including four buildings each 5 floors with final cost 26 m E. P.

 - Duties / Responsibilities:

 

- Responsible for overall construction process from reviewing design drawing up to handing over the project including all Arch, and MEP work for the following:

 

-Monitor and give a hand to site engineers and clarify Scope, Quality criteria and Safety measurements for all stakeholders (Main building --club house--with large lobby and lounge / Famous library branch / Restaurant / Jim / Spa including treatments rooms and men, women's changing, relaxations, sauna, steam rooms, Jacuzzi and, high level reception. and holding areas / Nursery / Lockers / Coiffeur / Administration building / Basement including hard kitchen, storage areas, five air handling units, four chillers         , and sum bits rooms / 2 Swimming pools / large Land escaping)

 

 

 

-.U.A.E (From March 2007 to January 2008).

.Work at El Shafaar Company in Dubai.

 

PROJECT ENGINEER RESIDENTIAL TOWER IN PALM JUMIRA.

 

* Work as a project engineer for high rise building in (Palm Jumeira) Dubai with  very well finishing requirements (120 million AED) including all facilities. - Duties / Responsibilities:

 

-Supervise, monitor and coordinate all activities with subcontractors, site engineers and consultants - check quality performance for all partners and the progress in site to keep project in scheduled time and with required budget - Daily, weekly and monthly progress report or the construction manager and attend weekly meetings with consultants, contractors for review progress, submittals and invoices.

   

Saudia Arabia (From August 2003 Till March 2007).

 

• Work at (Safa General Contracting & Enterprises Company)

CONSTRUCTION MANAGER AND PROJECT ENGINEER FOR:

-Prince Abd El- Me geed rest house on area (75000 m2) at the extremely north of Jeddah (Abhor) including all necessary luxurious finishing works for execution (6 private villas, 4 huge sessions, Guests “Women and men” buildings and prince’s followers with very large landscaping area).

-Many projects with Ministry of Transportation and Principalities including maintenance for some principalities headquarters and all sidewalk specifications, asphalt work, squares, renovations for main coast road, landscaping and decrease water table.

-Share in execution for huge trade center with high internal and external finishing work, services, utilities and large parking area.

-Execution for reinforcement concrete open channel and its culverts including earth work and natural stone work for 5000 L.M.

 

 

 

- EGYPT (From Aug 1998 Till Aug 2003). •Work at Lotus Construction Company:

 

1- CONSTRUCTION & PROJECT MANAGER FOR SEVERAL PROJECTS.

 

-            Arab Academy girl’s hotel consists of 6 residential floors and its extension, sport club, restaurant, entrance with excellent finishing.

-            Lotus residence - trading building at Smouha consists of 4 administrative floors and 12 residence floors with luxurious finishing requirements & famous consultant offices for internal finishing and architecture work.

-            Lotus Head office at same building with a lot of decorations and accuracy conditions. For more details, please visit website (Lotus group com- head office). - Lotus compound as-a project manager for a big resort and established two private villas, each of them (2000 m2), with reputable clients required high quality and excellent Specification

2- SENIOR SITE ENGINEER.

-            Steel structure project in Borg El-Arab zone about (50000 m2) Kirby supply and design and Belgium consultant office.

-            Also at Borg El-Arab industrial Area, I carried out a complete execution for an oil factory including St. Str. Work, management building with high finishing requirements & services and roads.

-            Different projects inside international garden in Alexandria (main gate building, club house, internal hotels, jets, landscaping).  

.

-            EGYPT (From July 1996 till Aug 1998) .Work at Holiday Beach Resort in El Ain El Sokhnaa.

 

SITE ENGINEER.

•            Ghorgada Area: Share in Construction of 45 villas as a solely site engineer and was capable enough as a just graduated Eng.

•            North Coast Area: worked in construction of swimming pools and landscaping including all civil and finishing works required

Education

Bachelor degree in civil engineering. 

Alexandria university. 

Professionals in the same Construction / Facilities sector as Moustafa Eid

Professionals from different sectors near Dubai, دبي

Other users who are called Moustafa

Jobs near Dubai, دبي

  • Direct apply

    **JOB PURPOSE**: · **JOB RESPONSIBILITIES**: · The job holder will be accountable for (but not limited to) the following: · - The job holder is responsible and accountable for (but not limited to) the following: · - Provides proactive administrative support to management with ref ...


  • Responsibilities · Develop andimplement HR strategies and initiatives aligned with the overallbusiness strategy · Bridge management andemployee relations by addressing demands, grievances or otherissues · Manage the recruitment and selectionprocess · Support current and future bu ...


  • PERFECT TECHNICAL WORKS & LANDSCAPING LLC Dubai, United Arab Emirates

    We are looking for a proactive and results-oriented Business Development Manager to drive growth and expand our client base in the landscaping sector. This role involves identifying new business opportunities, building client relationships, and developing strategies to increase o ...