beBee background
Professionals
>
Abu Dhabi
Shebin Mohamed

Shebin Mohamed

Abu Dhabi, أبوظبي
(0)

Social


About Shebin Mohamed:


Career Objective
A position in an engineering and related discipline providing an opportunity to make a strong contribution to the organizational goals through continued development of my professional skills.


PROFILE : 
• Have been involved in many Heavy Lift Projects involving offshore and onshore heavy lift cranes, over land transportation using multi axle platform trailer and SPMT’s.

• Lifting using cranes ranging from 25 Te to 3200 Te capacity crawler and telescopic cranes. Offshore cranes ranging from 250 Te to 3810 Te  

• A good experience and knowledge in project engineering, design and execution work for Heavy Haulage, Heavy Lifting and Transportation work in Offshore and onshore petrochemical, power plant projects.

• Extensive knowledge and experience in designing rigging plan using with Cranimax , Autocrane , AC trailer and Auto CAD tools.

• Extensive knowledge and experience in designing the Lifting and installation of Heavy equipments and making Transport arrangement drawings and stability calculations.

SKILLS: 
• Design Software: AutoCAD, Solid Works, 
• Autocrane & AC Trailer- Mammoet inbuild software 
• Primavera-6
• Analysis Software: Ansys.
• Microsoft Office & project
•  Cranimation V2.40, V3.0 and V4.0.

Experience


   
WORK EXPERIENCE:

             NATIONAL PETROLEUM CONSTRUCTION COMPANY (NPCC) (Abudhabi , UAE)
Address              : Mussafah , Abudhabi
Position Title             : Installation Engineer Heavy Lift and Transport 
Period             : October 2013 upto present

Company Profile : 
NPCC, as an established global construction company, provides Clients total Engineering, Procurement and Construction (EPC) services in the development of offshore and onshore Oil and Gas fields for the Arabian Gulf and the regional markets.
NPCC expanded its engineering capability for designing onshore & offshore facilities, loading terminals, storage tanks, pressure vessels and pipelines. Presently, NPCC has over 300 dedicated engineering staff to support the ongoing operations. The design team is fully equipped with latest state-of-the-art computers/softwares to meet engineering challenges.

Mammoet Middle East (Dubai, UAE) – Previous Company
Address              : Jebel Ali Free Zone (South)
Position Title             : Heavy Lift  Engineer 
Period             : June 2012 upto September 2013


Company Profile :Mammoet Middle East is based in Dubai (UAE) and operates in the   United Arab Emirates, Qatar, Oman, Saudi Arabia, Kuwait, Yemen, Jordan, Syria, Lebanon, Bahrain, Mauritius and East Africa. Since 1974 Mammoet Middle East has carried out many prestigious projects in the Gulf region. 
Mammoet (s) Pte Ltd Mammoet Romstar Sdn Bhd has been assessed and certified as meeting the requirements of ISO 9001:2000 for the following activities: Commercial, engineering and operation support for provision of transportation and erection of heavy/oversized and general project cargo.

           Al Jaber heavy Lift & Transport LLC (Abu Dhabi, UAE) – Previous Company
Address              : Mussafah Industrial Area, Abu Dhabi
Position Title             : Heavy Lift  Engineer
Period             : 26th of May 2010 up to 23rd of May 2012

  Company Profile: The Company has an integrated quality system designed around the     requirements of ISO 9001:2000, ISO 9001, ISO 14001 and OHSAS 18001. Al Jaber Heavy Lift and Transport LLC, a member of the Al Jaber Group, specializes in the full range of lifting and transportation services from hire and trip basis to the execution of totally engineered and managed “factory to foundation” projects comprising marine and overland transportation and erection of cargo at site.

 


JOB RESPONSIBILTIES:

• Ensure technical accuracy, quality and timely issuance of lifting and installation  engineering related deliverables (documents & drawings, as required) during the construction and installation phase of offshore / Onshore projects. 
• Feasibility studies for lifting of panels, equipment etc for NPCC Fabrication Yard 
• Feasibility studies for lifting and installation of offshore / Onshore structures. 
• Cargo barge layouts to facilitate safe and easy lifting offshore / onshore.
•  Selection of rigging gear based on lifting studies. 
• Clash checks, tilt studies during lifting and installation.
• Develop rigging / mooring arrangement for barges during load outs, float over, launching etc.
• Ensuring adherence to company procedures, client specifications, guidelines, international codes and standards.
• Receives allocated duties and studies Scope of Work to understand what is required. 
• Interfaces with other disciplines to ensure integration of activities. 
• Prepares specifications, data sheets and undertakes calculations to meet requirements of allocated tasks. 
• Co-ordinates with the Drafting Office Co-ordinator for the checking and issuing of drawings
•  Undertakes technical evaluations of vendor offers for less complex items to ensure PR’s technical details are satisfied.
•  Undertakes pre-engineering site surveys in order to provide input information to facilitate detailed engineering. 
•  Reports on work progress, bringing to notice potential problems or delays and recommends solutions.
• Prepares man-hour estimates for Engineering deliverables at the estimation stage, for consideration in the development of the final bid.

           Projects (From 26th May 2010 till present)

1. Long Term Agreement  (LTA) For Offshore Facilities CRPO For Four (4) SFNY SlipOver Platforms with associated Pipelines and Cables   (2019 - 2020 )

Client:    SAUDI ARAMCO (SAUDI ARABIAN OIL COMPANY)

The Saudi Arabian Oil Company awarded CRPO for demolition of an existing four (4) Production Platforms (Jackets & Topsides) at Safaniyah offshore field, as well as carrying out Engineering, Procurement, Fabrication, Transportation, Installation, Hookup and Pre-commissioning in Safaniyah field of 4 Slipover Jackets of the 4 Pile Standardized Electrified Design (SSS). These platform jackets will have nine (9) conductor slots, with boat landings along with Risers and J-tubes (for ICCP, Power & Umbilical’s), and will have water depths ranging from 14.9m to 22.3m.

2. R-SERIES 5 WELL PLATFORMS & PIPELINE PROJECT (2018 to 2019 )

Client:    ONGC OIL & NATURAL GAS CORPORATION LIMITED - INDIA
The R-12 and R-Series 5 Platforms & Pipeline Project involves primarily works for installation of four (4 nos.) well head platforms, one (1 no.) well head cum riser platform, intra field submarine pipelines for intra field well fluid transportation and for evacuation to Heera. The handling/separation/pumping of well fluid shall be carried out on ONGC hired jack up mobile offshore processing unit (MOPU-by others), which shall be Bridge, connected to existing R-12A platform. The project scope also includes topside modifications on existing R-12A and HRA platforms.
3. Life  Extension of Well Platform Project-    03 –Client –ONGC (2017 to 2018 )

Client:    ONGC OIL & NATURAL GAS CORPORATION LIMITED - INDIA
Life Extension of Well Platforms (LEWP) Project (Tender-3) involves primarily works for Decommissioning, Removal and Replacement of existing Topside Decks (along with all facilities except Christmas tree) by New Decks at the following 10 unmanned Well Platforms connected to the five process complexes NQO, MNW, WIN, BHS and SHP in Mumbai High North (MHN) and Mumbai High South (MHS) Fields.
       

4. BASSEIN DEVELOPMENT PROJECT

Client:    Larsen & Toubro Limited (LTHE
Scope the project is mainly to:
1. Installation of 8-legged BCPA3 jacket (5800 te) using a launch barge LB-2 and DLS4200 including piles, boat landings, standalone barge bumpers, grouting, transition piece installation etc;
2. Installation of 4-legged BLQ3 living quarter platform including piles, boat landings, standalone barge bumpers, grouting, transition piece installation etc;
3. Installation of 4-legged BH wellhead platform including piles, conductors, boat landings, grouting, transition piece installation etc;
4. Installation of BH wellhead topside including conductor top add-on installation and installation of adjustable stair case; (stair case shall be hanging from the Cellar Deck hinge connected and it shall be lowered to jacket level after Deck Installation).
5. Installation of BCPA3 process platform topside which includes five (4) nos. decks / modules, two (2) nos. deck cranes, stacks.
6. Installation of BLQ3 living quarter topside (single lift) (3800te), deck crane.
7. Installation of two (2) nos. interconnecting bridges and integration with topsides.
Scope of work:
• Preparation of  studies for lifting and installation of BH ,BCPA-3 and BLQ-3 Structures                 (Jackets, Decks, Boat landing and bridges)   
•   Preparation of Launch arrangement drawing for BCPA-3 Jacket using Launch Barge -LB-2.  
•   Cargo barge layouts to facilitate safe and easy lifting offshore / inshore.
•   Selection of rigging gear based on lifting studies. 
• Conceptual Design of Installation Aids, Bumpers and Guides. 
•  Clash checks, tilt studies during lifting and installation. 
Lifting scope :-
Weight range  :  400 Te up to 3800Te
Total number of erection  :  20
Jacket Launching              :  5800 Te

 

5. UPPER ZAKUM 750K PROJECT Nº. P7511SUB-SEA PIPELINES, CABLES,  OFFSHORE STRUCTURES & BROWN FIELD (EPC-1) (October 2013 to present)

Client:    Zakum Development Company  (ZADCO)
Scope the project is mainly to:
1. Install the Initial Production (IP) facilities on CI, NI ,WI & SI.
2. Install sub-sea pipelines, cables and offshore structures for the project.
3. Install tie-ins and perform modification works at existing platforms (ZCC / NSP / SSP / WSP, GIP, GPF, PC-20, PW-32, PW-38, PC-75, PC-80, PC-69 & PC-63).
4. Install limited onshore facilities on CI, NI, SI & WI such as pipe rack modules and associated civil works as well as pig traps on CI.
Scope of work:
• Preparation of  studies for lifting and installation of CI , NI , SI and WI Structures                    (Jackets, Decks, Boat landing and riser protectors)   
•  Cargo barge layouts to facilitate safe and easy lifting offshore / inshore.
•  Selection of rigging gear based on lifting studies. 
• Conceptual Design of Installation Aids, Bumpers and Guides. 
• Clash checks, tilt studies during lifting and installation. 
• Develop rigging / mooring arrangement for barges during load outs, float over, launching    etc.
• Ensuring adherence to company procedures, client specifications, guidelines, international codes and standards.
Lifting scope:-
Weight range  :  60 Te up to 2240Te
Total number of erection  :  180

6. UMM LULU FULL FIELD DEVELOPMENT PROJECT (PACKAGE-1) (October 2013 to present)

Client:    ADMA-OPCO

ADMA-OPCO is developing several new oil fields in its offshore concession areas i.e. Umm Lulu (UL), SARB and NASR (NS).  The new program objective is aligned and integrated with ADMA’s corporate strategic objective for the mid-term total sustainable production target of 1 MMSTBOPD.

Package-1:
EPC Package 1 (Six new Wellhead Towers, all risers, infield pipelines, 20” Main Oil Line and Riser Platform Jacket) has been combined with EPC Package 3 (Brownfield Tie-ins and Modifications to EPS Wellhead Tower Platforms WHT-4 and WHT-6) into the Scope of Work, which is now referred to as Package 1.
Scope of work:
•  Preparation of  studies for lifting and installation of 6 Well Head Towers ( Jackets & Decks)  
•  Cargo barge layouts to facilitate safe and easy lifting offshore / inshore.
•  Selection of rigging gear based on lifting studies. 
• Conceptual design of installation Aids, bumpers and guides.
Lifting scope :-
Weight range   :  60 Te up to 2500 Te
Total number of erection  :  50

7. Refurbishment/Replacement of Boatlanings in ZWSC & ZCSC Complex

Scope of work
Includes detailed engineering, procurement fabrication, offshore removal & installation of existing/new boatlandings. The services included Refurbishment/Replacement of boatlandings in ZAP, WIP, RP , GG-II, GIP,UTP, PGB, EP & WIP platforms  

8. Shaybah NGL (Natural Gas Liquid) project  (Dec 2012 to September 2013)

Shaybah NGL Program (Saudi Aramco Oil Company):
1. Inlet & Gas Processing;
2. NGL Recovery & Utilities;
3. NGL Power Generation Project;
4. Increase Gas Handling Capacity Project.

Scope of work:
Heavy lifting works at different plants (Pkg#1/2/3/4), divided over 5 locations within a radius of 50 [km].
The project includes a newly build 'NGL plant' (Pkg#1/2/3) and the expansion of 4 'Gas and Oil Separation plants' (Pkg#4; GOSP 1/2/3/4).

Details:
The total quantity of the items to be lifted is about 450 [-], concerning; Compressors, Drums, Flare Stacks, Transformers, etcetera.
The weight varies from 50 [Te] up to 1100 [Te] per item.

Equipment:
For the execution of the heavy lifting works, the following cranes will be used:
1. 12 Crawler cranes with capacity from 250 [Te] up to 1600 [Te] (LR1350/LR1600/CC1800/CC2400/CC2800/CC8800-1 et cetera);
2. Several Hydro cranes with capacity from 70 [Te] up to 250 [ Te].

9. South Pars Gas Field Development project Phases 22 ,23 & 24 (2012)

Client:       Pars Oil & Gas Company
Project:      South Pars Gas Field Development project Phases 22 ,23 & 24
Location:    Assaluyeh, Iran

Lifting scope :-
Weight range   :  25 Te up to 494 Te
Total number of erection  :  188

 

 

Transport and marine scope:-
Weight range   :  50 Te up to 250Te
Total number of cargo  :  50

Preparing method statement, Job Safety Analyses (JSA) and Task Risk Assessment (TRA), Ground bearing pressure calculation for cranes lifting and rigging activities and stability calculations for transport equipment for the all the transport  activities.

10. Transportation & Installation of 2 Numbers of 30 Te Reactors Jebel Ali -DUBAL. (Dubai)

The transportation of the two reactors from the Jebel Ali Port to DUBAL and installation of Reactors on to foundation by  means of jacking and skidding operation

11. Ruwais refinery expansion Project- RRE Package -1 (Ruwais-UAE) (2011-2012)
   
3.2million USD project

Company/owner: Takreer
Client: SK Engineering & Construction
Project: Ruwais refinery expansion package -1 (EPC – 1)
Location: Ruwais, UAE

Lifting scope :-
Weight range   :  25 Te up to 1,234Te
Total number of erection  :  125

Transport and marine scope:-
Weight range   :  50 Te up to 1,250Te
Total number of cargo  :  397
Anticipated barge trips :  36

Involved in preparing work pack for Lifting and Transportation activities work side by side with SK Engineering & Construction for approval of work pack from client (Takreer and PMC of Jacobs).

Preparing method statement, Job Safety Analyses (JSA) and Task Risk Assessment (TRA), Ground bearing pressure calculation for cranes lifting and rigging activities and stability calculations for transport equipment for the all the transport  activities.

Involvement in Erecting 125 Lifts and Transport with category of class 1and 2.Inside the construction Plant.

Worked with the Biggest Crawler cranes in the fleet such as Demag CC8800-1 Twin (3200Te Capacity), Demag CC8800-1 (1600Te Capacity), Demag CC2800-1 (600 Te capacity) ,Demag CC2500-1 (500Te Capacity),Demag 2600  (500Te Capacity),
Demag 2500  (450Te Capacity),Demag CC2500 (450Te capacity),Hitachi SCX2800 
& SCX1200.Equipment includes small crawler and Telescopic crane ranging from 50Te to 250Te Capacity.

Worked  with transport activities of modules and Heavy long Column inside a construction 
Plant (max.94.0m length and 11.0m Dia and the weight of 1,250Te (The world heaviest crude column). Equipment involved are SPMT 3rd Generation, Commetto Trailers, Flat bed & Lowbed 
Trailers with Prime movers.

Involvement in Site survey and Transportation of Heavy long column and Modules from outside    main road and inside plant and erecting the vessel onto the foundation using
3200 Te Crawler crane

12.    SK Engineering (Bab Gas Compression Project, Habshan - Abu Dhabi).2010-11

      Lifting and installation of Motors, compressors, Transformers, pressure vessels and also 
           erecting of flare stack

13.     ADGAS Train-1 and Boilers 1 & 2 Shutdown Project - Das Island. 2011

         The removal and re-installation of various vessels weighing from 10 Te up to 66Te 
         The job also involved jacking, skidding and transportation tasks.

14.            Transportation of CMS boats weighing 150 Te on Self Propelled Modular Trailers for 
          Topaz Engineering ADYARD.

15.            Transportation and load out of surge vessels from MIS Sharjah to Habshan on 
          Conventional trailers and landing craft.

TRAININGS

• Crosby Europe – The proper use of Crosby Lifting and Rigging Products Training.
• Safe Rigging and Slinging Course conducted by TUV
• Basic fire fighting training (Al Jaber Heavy Lift-UAE)
• Safety Awareness course (Al Jaber Heavy Lift-UAE)
• 4 point Lifting system (Spindle jack-Hydrospex) assembly and operation training (Al Jaber Heavy Lift-UAE).
• H2S Breathing Apparatus Familiarization Course.( ADGAS-DESCON UAE)
• Safety Induction and Working at height 
• Enhanced HSE roles and Responsibilities 
• Core behavioral Programme
• Manual Handling/Line of fire
• Confirmed Space Entry
• Permit authority course and Safety Induction (Takreer plant (RRE project)
SK Engineering & Construction) –Ruwais-UAE.


LANGUAGES KNOWN:-
● ENGLISH (speaking, reading, writing).
● HINDI (speaking, reading, writing).
● MALAYALAM (speaking, reading, writing).
● TAMIL (speaking).

DECLERATION:
I consider myself familiar with the Mechanical Engineering aspects and am confident of my ability to work in a team. I hereby declare that all the information provided is true to the best of my knowledge.
          

 

Education

Professional & Academic Qualification
Graduation:   B. Tech in Mechanical Engineering, From Calicut University, Kerala, India.

• All India Senior School Certificate Examination, Holy Trinity Kanjikode, Palakkad, Kerala (Central Board of Secondary Education, New Delhi, India).
• All India Secondary School Examination, Indian Islahi Islamic School Abu Dhabi (Central Board of Secondary Education, New Delhi, India).

Professionals from different sectors near Abu Dhabi, أبوظبي

Other users who are called Shebin

Jobs near Abu Dhabi, أبوظبي

  • Global Human Resource Consultancy

    Engineering Coordinator

    Found in: Talent AE 2A C2 - 6 days ago


    Global Human Resource Consultancy Abu Dhabi, United Arab Emirates

    The job posting is outdated and position may be filled · An Engineering Coordinator isresponsible for receiving and ordering supplies, dispatching service calls, maintaining inventory and controlling the flow of material and equipment from the engineering department in a cost eff ...


  • New York University Abu Dhabi أبو ظبي, United Arab Emirates

    تركز أبحاثنا في مختبر الأحياء الدقيقة البحريةعلى دراسة التفاعلات الميكروبية بين العوائل البحرية، مثل العوالقالنباتية والشعاب المرجانية، والميكروبيوم الخاص بها باستخدام مجموعةمتنوعة من تقنيات omics. مهارات الاتصال الممتازة في اللغةالإنجليزية، والقدرة على العمل في فرق كبيرة والإبدا ...

  • شركة SGS

    فني متعدد الإختبارات

    Found in: DrJobAR AE A2 - 7 hours ago


    شركة SGS أبوظبي, United Arab Emirates

    تنفيذ وظائف NDT وفقًا للإجراءات / المعايير / التعليمات الخاصة بالتقنيات / الأساليب التي تم اعتماده وتدريبه عليها. · قم بإعداد ومعايرة معدات NDT التقليدية. · فهم نطاق العمل قبل الإبلاغ عن أي وظيفة. · تطبيق معايير الاختبار وفقا للمواصفات أو المعايير المعمول بها وتقييم النتائج. · تن ...